Inspections for the day of: Friday, December 8, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-03797 Final12/8/200612/8/200612/8/2006 4:06:11 PMPNR
paul ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith looked at beds, 1 not on job or installed, told owner to padlock disc in off position. Need to see last bed, told elect to verify conduit strapping
ELE06-04510 Electrical Rough-In12/8/200612/8/200612/8/2006 4:03:05 PMPFAIL
zane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith called, left message, left corr notice, do not cover sticker, BCC all make-up shall be done, boxes, lights, recpts- boxes installed , address shall be posted, approved set of plans shall be on job
ELE06-04311 Final12/8/200612/8/200612/8/2006 4:00:34 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Matt Santacruz ok to final
ELE06-04399 Electrical Rough-In12/8/200612/8/200612/8/2006 3:08:38 PMPPART
###-#### - mark back half walls, baths and hard lids, front entry ok to cover
ELE06-03931 Final12/8/200612/8/200612/8/2006 2:16:36 PMPCANC
dennis ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wrong permit number, finalled ele06-01711
ELE06-01711 Final12/8/200612/8/200612/8/2006 2:14:15 PMPPASS
ok to final, core, shell, signed struct card
ELE06-03605 Electrical Rough-In12/7/200612/8/200612/8/2006 1:49:26 PMAPASS
DAVE OWEN - WILL BE AT OR MEET AT JOBSITE; Phone #: ###-#### Internet Inspection Request from: Randy Vail gndg ok to mount lights on north apron
ELE06-03958 Final12/8/200612/8/200612/8/2006 1:48:19 PMAPASS
customer has job open at 9am; Phone #: ###-#### Internet Inspection Request from: Ryan Christensen ok to final, corrections made
ELE06-04207 Final12/8/200612/8/200612/8/2006 12:59:36 PMPPASS
Scheduled by a contractor via Hello! on 12/8/2006 at 7:01:45 AM. Contact: ###-####. corr made, ok to final
ELE06-03931 Final12/7/200612/8/200612/8/2006 11:24:24 AMAPART
dennis ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith signed t/o card, left corr notice, need to see owner supplied equip after installed, core done
ELE06-04468 Electrical Rough-In12/7/200612/8/200612/8/2006 10:21:44 AMANR
This is for Apt. 3003 and 3005 for electrical rough-in and permenant service; Phone #: ###-#### Internet Inspection Request from: Laura Longshaw called contr, needs another permit, commercial must not be in nm cable, but conduit or mc cable
ELE06-04506 Rough-In Permanent Service12/7/200612/8/200612/8/2006 10:02:18 AMAPASS
bob ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith called, left message, wire not in box for garage door opener, no garage lite box, ric ok, p/s u/g n ok
ELE06-03571 Permanent Service12/7/200612/8/200612/8/2006 9:53:49 AMAPASS
Jeremy, please call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt p/s exst meter pak n ok
ELE06-03818 Conference12/8/200612/8/200612/8/2006 9:13:38 AMADONE
Please call Sean at ###-#### Internet Inspection Request from: Latisha Peltier called, contr would like to meet but not in area, will resched for Monday
ELE06-04499 Final12/7/200612/8/200612/8/2006 9:08:32 AMAPASS
circuit for 110 volt hot tub, Homeowner would like inspection done as early as possible so she can get to work. Any questions on wiring call Tate @ ###-#### Internet Inspection Request from: Andy Rose ok to final
ELE06-01275 Final12/6/200612/8/200612/8/2006 8:41:22 AMAPART
jim - first thing in the morning please ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith met with bldr, mfgr, told that a field evaluation on x-ray was still required, and not supposed to use machine till done