Inspections for the day of: Friday, December 8, 2006.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00614 FIR-Aging Inspection12/8/200612/8/200612/11/2006 3:14:24 PM NR
Work is in progress.
FIR05-00836 INSP-Final Inspection12/7/200612/8/200612/8/2006 4:37:50 PMPFAIL
See city approved plans for induct detectors tested. 17 inducts tested.
FIR06-00787 INSP-Final Inspection12/8/200612/8/200612/8/2006 4:34:51 PMPPASS
Permit finaled
FIR06-00787 INSP-Sprinkler Rough-in/Hydro12/8/200612/8/200612/8/2006 4:34:13 PMPPASS
Permit finaled
BLD05-00635 FIRE-Final Inspection12/7/200612/8/200612/8/2006 3:41:10 PMACANC
ruth; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIR06-00839 INSP-Final Inspection12/7/200612/8/200612/8/2006 3:37:23 PMPFAIL
Still need the alarm interconnections tested and the forward flush passed.
FIR06-00909 INSP-Final Inspection12/7/200612/8/200612/8/2006 3:36:01 PMPFAIL
Per contractor the monitoring company that was set up has been let go and a new one has not been found. No testing performed.
FIR06-00841 INSP-Sprinkler Rough-in/Hydro12/8/200612/8/200612/8/2006 3:34:32 PMPFAIL
Tenting of the sprinkler piping still is not acceptable. I went over the problem areas with the superintendant
FIR06-00872 INSP-Sprinkler Rough-in12/8/200612/8/200612/8/2006 3:33:53 PMPPASS
Sprinkler piping is ok to cover
FIR06-00664 INSP-Sprinkler Rough-in/Hydro12/7/200612/8/200612/8/2006 1:44:36 PMAPASS
The remaining section of underground supply line is ok to cover
BLD06-02264 FIRE-Final Inspection12/8/200612/8/200612/8/2006 1:30:11 PMPPASS
Life safety finaled
FIR06-00771 INSP-Final Inspection12/8/200612/8/200612/8/2006 1:29:49 PMPPASS
Permit finaled
FIR06-00517 INSP-Final Inspection12/7/200612/8/200612/8/2006 12:21:18 PMAPASS
Permit finaled. Forward flush passed.
FIR06-00832 INSP-Final Inspection12/7/200612/8/200612/8/2006 12:19:25 PMAPASS
Permit finaled
FIR06-00239 INSP-Final Inspection12/7/200612/8/200612/8/2006 12:17:37 PMAPASS
permit finaled
FIR06-00839 INSP-Sprinkler Rough-in/Hydro12/7/200612/8/200612/8/2006 10:48:06 AMAPASS
Above ground hydro test passed.
FIR06-00548 INSP-Sprinkler Rough-in12/7/200612/8/200612/8/2006 10:11:48 AMAPASS
Gave approved for piping to be covered above hardlids next to pool at the extended coverage heads and in the east stairwell. No ceilings had been originally shown on plans for the stairwell.
FIR06-00752 INSP-Sprinkler Rough-in/Hydro12/7/200612/8/200612/8/2006 9:15:13 AMAPASS
24 hour air test passed.