ESC06-00233
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/12/2006 1:49:00 PM | A | PASS |
|
|
|
ESC05-01219
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/11/2006 11:38:12 AM | A | PASS |
|
|
Site looks good. All bmp's are being maintained.
|
ESC05-02060
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/11/2006 10:45:09 AM | A | PASS |
|
|
Site looks good. All bmp's are being maintained.
|
ESC06-00628
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/11/2006 10:14:41 AM | A | PASS |
|
|
Site looks good. All bmp's are being maintained.
|
ESC06-00366
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/11/2006 10:12:15 AM | A | PASS |
|
|
Site looks good. All bmp's are being maintained.
|
ESC05-01617
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/11/2006 10:11:29 AM | A | PASS |
|
|
Site looks good. All bmp's are being maintained.
|
ESC05-02060
| Tracking Control | 11/17/2006 | 12/8/2006 | 12/11/2006 10:07:20 AM | A | CANC |
|
|
Inspection duplicated.
|
ESC04-01435
| Conference | 12/7/2006 | 12/8/2006 | 12/8/2006 2:41:40 PM | P | PART |
|
|
Met with PD and General to walk site and discuss dewatering concerns. Site looks good. Steve made some recommendations regarding sediment controls near river bank. PD is sending us an addendum to current ESC plan.
|
ESC06-01655
| BMP Violation | 12/8/2006 | 12/8/2006 | 12/8/2006 2:39:31 PM | P | PART |
|
|
verbal c/n to RP. access control needed on site to prevent trackout onto Boise Avenue and all other conditions on ESC permit must be followed.
|