Inspections for the day of: Friday, December 8, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-03046 BLD-Energy code compliance12/8/200612/8/200612/8/2006 4:12:23 PMPPASS
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-01305 BLD-Framing/Rough-in12/8/200612/8/200612/8/2006 3:24:19 PMPPASS
joey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-02058 BLD-Final12/7/200612/8/200612/8/2006 3:00:00 PMPNR
mark ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Mech did not pass.
BLD06-02793 BLD-Energy code compliance12/8/200612/8/200612/8/2006 2:37:52 PMPPART
jeremy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to insulate floor above garage.
BLD05-03043 BLD-Energy code compliance12/8/200612/8/200612/8/2006 2:15:45 PMPFAIL
NICK; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to provide additional fireblocking at 2nd floor and ceiling were oval duct passes and were air ducts pass at ceiling.
BLD06-02501 BLD-Framing/Rough-in12/8/200612/8/200612/8/2006 1:43:29 PMPPASS
rob - suite 140; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Ok to cover walls only. All screws \removed.
BLD06-00272 BLD-Conference12/8/200612/8/200612/8/2006 1:08:12 PMAFAIL
A stop work order has been posted. Bld. permit is expired. All new framing that has been constructed has been covered. All new elec. that was installed was insp. and failed and has been covered.
BLD06-02622 BLD-Framing/Rough-in12/7/200612/8/200612/8/2006 11:21:07 AMAPASS
frank ###-#### Store front and south interior walls.
BLD06-01690 BLD-Framing/Rough-in12/7/200612/8/200612/8/2006 10:29:44 AMANR
Scheduled by a contractor via Hello! on 12/7/2006 at 7:33:36 AM. Contact: ###-####.
BLD06-02692 BLD-Final12/7/200612/8/200612/8/2006 9:49:23 AMANR
SEAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to have mech and zoning finaled.
BLD06-02692 BLD-Framing/Rough-in12/7/200612/8/200612/8/2006 9:48:41 AMAPASS
SEAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-02672 BLD-Energy code compliance12/7/200612/8/200612/8/2006 9:08:39 AMAPASS
Fadil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD06-02211 BLD-Other12/7/200612/8/200612/8/2006 8:59:41 AMAPART
julio - note: ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to repair some wires, exceed 1 in 8 as noted on approved plans. insp. pending other ri prior to cover.
BLD06-02211 BLD-Energy code compliance12/8/200612/8/200612/8/2006 8:58:38 AMAPASS
julio - note: ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Attic insul.
BLD06-02211 BLD-Framing/Rough-in12/8/200612/8/200612/8/2006 8:57:52 AMAPASS
julio - note: ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith