FIR09-00530
| FIR-Aging Inspection | 12/8/2009 | 12/8/2009 | 12/16/2009 3:11:46 PM | | NR |
|
|
Work is in progress as based on the last conversation I had with Guy.
|
FIR09-00676
| INSP-Sprinkler Rough-in | 12/8/2009 | 12/8/2009 | 12/8/2009 3:20:05 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
BLD09-00945
| FIRE-Final Inspection | 12/7/2009 | 12/8/2009 | 12/8/2009 2:23:41 PM | A | FAIL |
|
|
This inspection was for phase 2. The insulation at the roof deck needs repaired. The existing "access controled egress" lock on the door to the lobby needs to meet the requirements of chapter 10 of the IFC. An existing duct smoke detector has been removed from a hvac unit and will need to be re-installed and tested. The existing fire alarm system will need to be tested for functionality as well. The ADA compliant door hardware has not been installed on both doors for the short corridor next to the electrical room as shown to be done on the city approved plans. I spoke to Chris with HC Company about the fire alarm/duct smoke detector and the "access controled egress door" via a phone conversation.
|
BLD09-02001
| FIRE-Final Inspection | 12/7/2009 | 12/8/2009 | 12/8/2009 1:12:33 PM | A | FAIL |
|
|
Provide a tagged fire extinguisher as discussed. All other items wil be ok.
|
BLD09-01856
| FIRE-Final Inspection | 12/7/2009 | 12/8/2009 | 12/7/2009 3:07:25 PM | A | PASS |
|
|
life safety passed
|