Inspections for the day of: Wednesday, December 8, 2010.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00254 INSP-Conference11/24/201012/1/2010 A 
Follow up inspection. Steve Bevans ###-####
FIR09-00321 FIR-Aging Inspection12/8/201012/8/201012/16/2010 1:21:21 PM NR
Per Brett he is waiting on a points map for the facp and then will call in the inspection.
FIR10-00032 INSP-Final Inspection12/8/201012/8/201012/8/2010 12:02:48 PMPPASS
permit finaled
FIR10-00470 INSP-Sprinkler Rough-in12/7/201012/8/201012/8/2010 11:44:42 AMAPASS
The rough-in inspection for the three pendant heads in the second floor corridor is passed. They can now be recovered.
BLD10-00114 FIRE-Final Inspection12/8/201012/8/201012/8/2010 11:43:27 AMPPART
A temporary occupancy was given, with Scott's and Jason's permission, until the front entry canopy is complete and the additional fire sprinkler is installed and the lift at the platform is installed.
FIR10-00072 INSP-Final Inspection12/8/201012/8/201012/8/2010 11:42:22 AMPPART
A temporary occupancy was given, with Scott's permission, until the front entry canopy is complete and the additional fire sprinkler is installed.
BLD10-00655 FIRE-Final Inspection12/7/201012/8/201012/8/2010 9:38:46 AMAPASS
life safety passed.
BLD10-00654 FIRE-Final Inspection12/7/201012/8/201012/8/2010 9:38:14 AMAPASS
life safety passed.
BLD10-00653 FIRE-Final Inspection12/7/201012/8/201012/8/2010 9:37:39 AMAPASS
life safety passed.
BLD10-02695 FIRE-Final Inspection12/7/201012/8/201012/8/2010 9:03:23 AMAPASS
Life safety passed.
FIR09-00342 INSP-Final Inspection12/2/201012/8/201012/8/2010 8:58:15 AMAPASS
Permit finaled
FIR10-00052 INSP-Final Inspection12/7/201012/8/201012/8/2010 7:22:22 AMAPASS
Permit finaled