FIR06-00254
| INSP-Conference | 11/24/2010 | 12/1/2010 | | A | |
|
|
Follow up inspection. Steve Bevans ###-####
|
FIR09-00321
| FIR-Aging Inspection | 12/8/2010 | 12/8/2010 | 12/16/2010 1:21:21 PM | | NR |
|
|
Per Brett he is waiting on a points map for the facp and then will call in the inspection.
|
FIR10-00032
| INSP-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 12:02:48 PM | P | PASS |
|
|
permit finaled
|
FIR10-00470
| INSP-Sprinkler Rough-in | 12/7/2010 | 12/8/2010 | 12/8/2010 11:44:42 AM | A | PASS |
|
|
The rough-in inspection for the three pendant heads in the second floor corridor is passed. They can now be recovered.
|
BLD10-00114
| FIRE-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 11:43:27 AM | P | PART |
|
|
A temporary occupancy was given, with Scott's and Jason's permission, until the front entry canopy is complete and the additional fire sprinkler is installed and the lift at the platform is installed.
|
FIR10-00072
| INSP-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 11:42:22 AM | P | PART |
|
|
A temporary occupancy was given, with Scott's permission, until the front entry canopy is complete and the additional fire sprinkler is installed.
|
BLD10-00655
| FIRE-Final Inspection | 12/7/2010 | 12/8/2010 | 12/8/2010 9:38:46 AM | A | PASS |
|
|
life safety passed.
|
BLD10-00654
| FIRE-Final Inspection | 12/7/2010 | 12/8/2010 | 12/8/2010 9:38:14 AM | A | PASS |
|
|
life safety passed.
|
BLD10-00653
| FIRE-Final Inspection | 12/7/2010 | 12/8/2010 | 12/8/2010 9:37:39 AM | A | PASS |
|
|
life safety passed.
|
BLD10-02695
| FIRE-Final Inspection | 12/7/2010 | 12/8/2010 | 12/8/2010 9:03:23 AM | A | PASS |
|
|
Life safety passed.
|
FIR09-00342
| INSP-Final Inspection | 12/2/2010 | 12/8/2010 | 12/8/2010 8:58:15 AM | A | PASS |
|
|
Permit finaled
|
FIR10-00052
| INSP-Final Inspection | 12/7/2010 | 12/8/2010 | 12/8/2010 7:22:22 AM | A | PASS |
|
|
Permit finaled
|