BLD11-02456
| BLD-Foundation | 12/8/2011 | 12/8/2011 | 12/9/2011 1:11:15 PM | P | PART |
|
|
|
BLD11-02536
| BLD-Final | 12/8/2011 | 12/8/2011 | 12/9/2011 10:47:22 AM | P | FAIL |
|
|
TIm Phone #: ###-####,,, still needs zoning approval
|
ESC10-00922
| General Inspection | 12/8/2011 | 12/8/2011 | 12/9/2011 10:42:36 AM | | DONE |
|
|
|
BLD11-02240
| BLD-Final | 12/8/2011 | 12/8/2011 | 12/9/2011 8:19:57 AM | P | PART |
|
|
peter Phone #: ###-####,, needs a protection post in front of the furnace,, seal firewall
|
BLD11-00136
| BLD-Final | 12/8/2011 | 12/8/2011 | 12/9/2011 8:19:57 AM | P | PART |
|
|
greg Phone #: ###-####,, all ok except need the engineer approval on the glass guardrail
|
ESC11-00293
| General Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 2:42:19 PM | A | PASS |
|
|
|
MIS11-00011
| BLD-Conference | 12/7/2011 | 12/8/2011 | 12/8/2011 2:33:22 PM | A | PASS |
|
|
status check,, no work going on
|
BLD10-02412
| BLD-Framing/Rough-in | 12/7/2011 | 12/8/2011 | 12/8/2011 1:17:39 PM | A | PART |
|
|
Chad Phone #: ###-####,, partial,, needs mech rough approval,, then ok to insulate,, one porch not done on south east 2 upper units,,, will need structural engineer letter of ok on concrete poured without inspection and also ext. stairway attachments to slab
|
BLD11-02809
| BLD-Framing/Rough-in | 12/7/2011 | 12/8/2011 | 12/8/2011 12:14:20 PM | A | PASS |
|
|
Shane Phone #: ###-####
|