FIR11-00263
| INSP-Final Inspection | 12/6/2011 | 12/8/2011 | 12/12/2011 8:55:22 AM | A | CANC |
|
|
Rescheduled for 12/12/2011
|
FIR11-00610
| INSP-Sprinkler Rough-in/Hydro | 12/8/2011 | 12/8/2011 | 12/8/2011 3:37:16 PM | P | PASS |
|
|
Rough-in passed. Sprinkler piping can be covered.
|
BLD11-01251
| FIRE-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 3:03:19 PM | P | FAIL |
|
|
This inspection was for the east side remodeled area only. The two exit discharge lights need to be repaired. Also a fire alarm sytem is shown to be installed but has not been. It appears to be only there to monitor the duct smoke detectors. I told the contractor that the remote annunciators as installed are ok if the fire alarm panel is installed. If it is not installed then the correct remote annunciators need to be installed. The duct smoke detectors will need to be tested when a decision has been made.
|
FIR11-00543
| INSP-Sprinkler Rough-in | 12/8/2011 | 12/8/2011 | 12/8/2011 12:50:02 PM | P | PASS |
|
|
The sprinkler piping in rooms 193, 194, 195 and 196 is ok to cover. I also spoke to Scott with Jacobsen Construction about inspections prior to covering.
|
FIR11-00579
| INSP-Sprinkler Rough-in | 12/8/2011 | 12/8/2011 | 12/8/2011 12:43:36 PM | P | PASS |
|
|
The second floor office sprinkler piping can be covered.
|
BLD11-02516
| FIRE-Final Inspection | 12/8/2011 | 12/8/2011 | 12/8/2011 12:12:18 PM | A | PASS |
|
|
life safety passed. I let Jr. know that the keyed dead bolt to the gun room will need to be single action on the egress side.
|
FIR11-00374
| INSP-Sprinkler Rough-in | 12/7/2011 | 12/8/2011 | 12/8/2011 11:12:52 AM | A | PASS |
|
|
The second floor office sprinkler piping is ok to cover.
|
BLD11-01835
| FIRE-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 10:27:06 AM | A | FAIL |
|
|
Resubmitt plans showing the actual floor layout, mount and tag fire extinguisher as marked on the plans, provide approved door hardware as marked on the plans, provide missing exit signs as marked on the plans and repair the emergency light as marked on the plans.
|
BLD11-02349
| FIRE-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 9:20:05 AM | A | PASS |
|
|
life safety passed
|
FIR11-00600
| INSP-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 9:19:48 AM | A | PASS |
|
|
permit finaled
|
FIR11-00541
| INSP-Sprinkler Rough-in | 12/7/2011 | 12/8/2011 | 12/8/2011 9:02:13 AM | A | PASS |
|
|
Sprinkler piping can be covered but as-builts showing the actual supply piping layout is required prior to a final sign off. The piping arrangement shown is not even close.
|
FIR11-00609
| INSP-Final Inspection | 12/7/2011 | 12/8/2011 | 12/8/2011 7:39:26 AM | A | PASS |
|
|
Permit finaled
|