BLD15-02333
| FIRE-Final Inspection | 12/8/2015 | 12/8/2015 | 12/8/2015 2:56:39 PM | P | FAIL |
|
|
Inspection was actually for a conference. I spoke to Dave about minimum clearances between the covered car ports. 20'-0" in the minimum on the east/west street and 26'-0" on the north/south street due to a fire hydrant. Referenc IFC appendix D
|
FIR15-00724
| INSP-Sprinkler Rough-in | 12/8/2015 | 12/8/2015 | 12/8/2015 2:05:23 PM | P | PASS |
|
|
See the city approved plans for hard lid areas where the piping is ok to cover. I noted that branch line restraints will be required for all new branchlines that require it.
|
FIR15-00719
| INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/8/2015 | 12/8/2015 2:03:53 PM | P | PART |
|
|
Overhead hydro of the first floor passed. The overhead hydro of the second floor failed twice.
|
FIR15-00556
| INSP-Supply line flush | 12/7/2015 | 12/8/2015 | 12/8/2015 11:56:58 AM | A | PASS |
|
|
Underground flush passed
|