Inspections for the day of: Tuesday, December 8, 2015.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF15-00025 INSP-Sprinkler Rough-in/Hydro12/8/201512/8/201512/8/2015 8:32:25 AMPPASS
Hydrostatic test completed satisfactory 12/7/15 (reading at 2:10pm 212 psi, again at 4:14pm 212psi)
Rough in inspection completed satisfactory, ok to cover.
**To be verified at final** two dry pendants in cooler, 4 dry sidewalls at entrances and one regular sidewall in electrical room. Stubs were present at roughin
. Also to be completed riser accessories (FDC, main drain etc)