PLM16-01814
| PLM-Aging Inspection | 12/8/2016 | 12/8/2016 | 12/12/2016 11:14:54 AM | | PEND |
|
|
Tagged house to call.
|
PLM15-04378
| DOC - Permit Finaled | 12/8/2016 | 12/8/2016 | 12/8/2016 4:09:38 PM | P | PASS |
|
|
|
PLM16-00737
| PLM-Aging Inspection | 12/8/2016 | 12/8/2016 | 12/8/2016 3:44:12 PM | | PEND |
|
|
Tagged 12/8/16 to call cell with status
|
PLM16-04451
| Water Heater Final | 12/8/2016 | 12/8/2016 | 12/8/2016 3:25:27 PM | P | NR |
|
|
Please call Bob at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
|
PLM16-04451
| Other | 12/8/2016 | 12/8/2016 | 12/8/2016 3:24:51 PM | P | PART |
|
|
gas pressure test. 20# test ok
|
PLM16-02489
| Water and/or Sewer | 12/8/2016 | 12/8/2016 | 12/8/2016 3:12:01 PM | P | PASS |
|
|
Fixing correction notice list please come later in pm Phone #: ###-#### Inspection requested via web by Mark Kelso
|
PLM16-02489
| DOC - Permit Finaled | 12/8/2016 | 12/8/2016 | 12/8/2016 3:11:33 PM | P | PASS |
|
|
|
PLM16-03755
| Plumbing Rough-in | 12/7/2016 | 12/8/2016 | 12/8/2016 2:34:55 PM | P | FAIL |
|
|
RE-INSPECTION Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. See correction notice from 12/7
|
PLM16-03956
| Plumbing Rough-in | 12/7/2016 | 12/8/2016 | 12/8/2016 2:33:38 PM | P | FAIL |
|
|
50376 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. No repairs have been made.
|
PLM16-04437
| Plumbing Rough-in | 12/8/2016 | 12/8/2016 | 12/8/2016 2:33:38 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen. DWV test failed. DWV in crawl backgrading. Correct to 1/4"/ft. Water test ok
|
PLM16-03999
| Plumbing Rough-in | 12/7/2016 | 12/8/2016 | 12/8/2016 1:17:48 PM | P | PASS |
|
|
|
PLM16-04369
| Water and/or Sewer | 12/8/2016 | 12/8/2016 | 12/8/2016 12:41:58 PM | P | PART |
|
|
Phone #: ###-####. New double check valve needs certified
|
PLM16-03174
| Final | 12/7/2016 | 12/8/2016 | 12/8/2016 11:46:36 AM | A | PASS |
|
|
Lock box code is 2730. Thank you. Phone #: ###-#### Inspection requested via web by Ken Duplex
|
PLM16-03959
| Final | 12/7/2016 | 12/8/2016 | 12/8/2016 11:19:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM16-03868
| Final | 12/7/2016 | 12/8/2016 | 12/8/2016 11:12:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM16-04451
| Other | 12/8/2016 | 12/8/2016 | 12/8/2016 10:54:29 AM | A | NR |
|
|
Gas pressure. Will be ready later in the morning. Please call Bob at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
|
PLM16-02489
| Final | 12/7/2016 | 12/8/2016 | 12/8/2016 10:53:29 AM | A | FAIL |
|
|
Final Inspection owner is Wong 2088908135 Phone #: ###-#### Inspection requested via web by Mark Kelso. 1. Install a tempering valve on the water heater to control the pedicure sinks. 2. Install a thermal expansion tank on the water heater. 3. Mechanically support the backflow assemblies per plans. 4. 1" RP is discharging. 5. Grade air gap lines from the backflow assemblies. 6. Provide a 1" airgap on the T&P drain. 7. Provide a tempering valve on the pedicure area hand sink. 8. Support drains on the pedicure chair drains.
|
PLM16-04446
| Water Heater Final | 12/7/2016 | 12/8/2016 | 12/8/2016 9:39:30 AM | A | FAIL |
|
|
water on floor around the water heater. T&P drain tube is wet inside. Strap the pex water line ridgid to the wall. Ensure the pressure tank is pressurized to manufacturers instructions.
|
PLM16-04197
| Plumbing Rough-in | 12/8/2016 | 12/8/2016 | 12/8/2016 7:23:55 AM | A | PART |
|
|
top out of waste and water for the floral area.
|
PLM16-04197
| Groundwork | 12/8/2016 | 12/8/2016 | 12/8/2016 7:22:55 AM | A | PART |
|
|
Combination waste and vent underground to the floral area.
|