BLD97-01243
| INSP - Conference | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | | PASS |
|
|
/ / 342 - conf w/Ron Hill
|
BLD97-01243
| INSP - Footings | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | | PART |
|
|
/ / 342 - already poured w/spec insp on site....
|
BLD97-01243
| INSP - Conference | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | | PART |
|
|
/ / 342 - need precon next Tues am....and I want to look at everything
|
BLD97-02104
| INSP - Conference | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | | PASS |
|
|
/ / 342 - approved 1 hr modification detail
|
BLD97-03365
| INSP - Conference | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | | PASS |
|
|
/ / 342 - w/builder and Idaho Truss re:truss fix for cantilever gable
|
BLD1053886
| INSP - Final | 12/8/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | A | NR |
|
|
12/09/97 342 -
|
BLD97-02104
| INSP - Framing/Rough-in | 12/8/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | A | PASS |
|
|
12/09/97 342 - need ceiling grid inspection
|
BLD97-03098
| INSP - Final | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | PASS |
|
|
12/09/97 342 - HE SAID YOU HAVE APT FOR 1:30-2:00
|
BLD97-03327
| INSP - Footings | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | PASS |
|
|
12/09/97 342 - 1:30pm
|
BLD97-03365
| INSP - Framing/Rough-in | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | PASS |
|
|
12/09/97 342 - 2-2:30pm
|
BLD97-03568
| INSP - Footings | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | NH |
|
|
12/09/97 342 - no one on site....ck setbks as is close to back fence. ea
|
BLD97-03608
| INSP - Framing/Rough-in | 12/8/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | PASS |
|
|
12/09/97 342 -
|
MEC97-03593
| INSP - Final | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | FAIL |
|
|
12/09/97 342 - CALL ###-#### (ROD PACE) TO SEE IF HE IS HOME. IF NOT CAL ACCESS.
|
MEC97-03593
| INSP - Final | 12/9/1997 | 12/9/1997 | 12/9/1997 12:00:00 AM | P | FAIL |
|
|
12/09/97 342 - CALL ###-#### (ROD PACE) TO SEE IF HE IS HOME. IF NOT CAL ACCESS.
|