BLD01-00117
| BLD-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | | PART |
|
|
called and talked with dirk told him to take job cards tooffice for oc. 12/9/2002 4:18:57 PM 12/9/2002 4:19:11 PM
|
MIS01-00240
| MIS-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | | PART |
|
|
|
BLD00-02965
| BLD-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | | CANC |
|
|
no inspections called for at this time. 12/9/2002 5:13:48 PM
|
MIS01-00206
| MIS-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | | CANC |
|
|
|
BLD00-03017
| BLD-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | | CANC |
|
|
no inspections called for at this time. 12/9/2002 5:13:29 PM
|
BLD02-01481
| BLD-Final | 12/6/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | A | FAIL |
|
|
###-#### mark.> Left c/n for racks and rest room, but can not ok temp oc untill fire/life safety has done so. 12/9/2002 12:39:03 PM
|
BLD02-02385
| BLD-Framing/Rough-in | 12/6/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | A | PART |
|
|
-BRIAN- ###-####--CALL 1ST BEFORE INSP. meet withthe framer about c/n , stairs is the issue,as drawn on plans stair are difficult to construct framer will reconstruct from landing down. 12/9/2002 11:27:02 AM
|
BLD02-02850
| BLD-Foundation | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/09/2002 at 06:57:19. Contact: ###-####.wip. 12/9/2002 10:32:40 AM
|
MEC02-03573
| Pressure Test | 12/6/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 13:43:59. Contact: ###-####.
|
MEC02-03573
| Final | 12/6/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 13:44:10. Contact: ###-####.
|
BLD02-01845
| BLD-Conference | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | PART |
|
|
###-####
|
BLD02-01795
| BLD-Framing/Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | NR |
|
|
###-#### joe need to complete prior c/n note truss company re applied truss connectors at garage 3 ply girder. 12/9/2002 4:08:25 PM
|
BLD02-02415
| BLD-Framing/Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | PART |
|
|
steve--shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieok to side, still need interior shear wall and bloking at top of this wall as per plan. 12/9/2002 5:00:27 PM
|
BLD02-01461
| BLD-Conference | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | PART |
|
|
adding fire blanket to top of hood 12/9/2002 4:36:19 PM
|