FIR01-00577
| FIR-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | | NR |
|
|
I spoke with the general contractor by phone and he stated that the fire alarm and the fire sprinkler work was still in progress but had been delayed by the hospital due to funding for the project 12/9/2002 3:58:26 PM
|
BLD02-01481
| FIRE-Final Inspection | 12/6/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | A | FAIL |
|
|
The fire alarm system does not meet current code requirements. Provide approved fire alarm submittals prior to installation of code compliant system. Provide code compliant support for the fire sprinkler riser. The sprinkler pendant on the east side of the remodeled restroom is too close to the wall and must be relocated. The sprinkler pendant in front of the north entrance in the show room is too close to the wall and is painted. It must be replaced and relocated. The upright sprinkler heads on the west side of the wall that separates the ware house from the show room exceed the maximum allowable distance from the wall. Additional sprinkler heads will be required. The upright sprinkler head under the overhead door in the warehouse is overspaced. An additional upright or sidewall head will be required. Remove the manual flush bolts from both sets of the entry/exit doors in the showroom. Only one set of these doors is allowed to have key locking hardware. The other must have approved hardware (crash bar, lever, pad) 12/9/2002 3:38:23 PM
|
FIR02-00385
| INSP-Conference | 12/9/2002 | 12/9/2002 | 12/9/2002 12:00:00 AM | P | PART |
|
|
the inspection was from the north stub-in to the first 90 elbow and then three additional lenghts of pipe. This section of the underground I witnesses the bedding and the covering as well as the pipe being installed. It was OK to cover. The rest of the pipe will be inspected later 12/9/2002 4:24:20 PM
|