BLD01-01945
| BLD-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | | PASS |
|
|
|
BLD01-02182
| BLD-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | | PASS |
|
|
316 12/9/2003 8:21:22 AM
|
BLD01-02848
| BLD-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | | PASS |
|
|
passed on 10/18/02 12/9/2003 8:10:28 AM
|
MIS02-00180
| MIS-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | | PASS |
|
|
|
MIS02-00192
| MIS-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | | PASS |
|
|
316 on 8/9 12/9/2003 8:18:08 AM
|
BLD00-03428
| BLD-Concrete | 12/4/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PART |
|
|
Randy ###-#### wip covered with special insp. 12/9/2003 4:25:05 PM
|
BLD03-02569
| BLD-Wall cover | 12/4/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 3:12:23 PM. Contact: ###-####. fire stopping to be verified above ceilling in common area. ele box less than 24 inch septration by back door of common area need spudy pad or moved/ ceilling steel rafters need top flange screwed to ledger/info on insulation for store front soffit area to be submited . ok to cover upon mech aproval of fire damper instaltion. 12/9/2003 9:30:29 AM
|
BLD03-02570
| BLD-Wall cover | 12/4/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 3:13:47 PM. Contact: ###-####. hvac structral welding approved and reports pending. 12/9/2003 9:31:26 AM
|
BLD03-02811
| BLD-Footing | 12/5/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 2:10:40 PM. Contact: ###-####. wip 12/9/2003 10:31:38 AM
|
BLD02-01628
| BLD-Final | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PASS |
|
|
karen or jerry; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-01332
| BLD-Final | 12/5/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 7:03:09 AM. Contact: ###-####.
|
BLD03-02254
| BLD-Footing | 12/4/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 1:24:57 PM. Contact: ###-####. wip si report pending. 12/9/2003 4:24:32 PM
|
BLD02-02919
| BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | NR |
|
|
dan- ###-#### pending door hardware isues/ fire shuder counter listing requirments/fire testing to proceed 12/10 am. 12/9/2003 4:23:05 PM
|