ELE03-03831
| Electrical Rough-In | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PASS |
|
|
contact: Greg Oyama; Phone #: ###-#### Internet Inspection Request from: Deb McCoy p/s ug n ok 12/9/2003 9:21:24 AM
|
ELE03-02909
| Final | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PASS |
|
|
Skip; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
ELE03-03178
| Final | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PASS |
|
|
Lloyd; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
ELE03-03422
| Electrical Rough-In | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 8:04:35 AM. Contact: ###-####. light bases ok 12/9/2003 2:23:05 PM
|
ELE03-03422
| Rough-In Permanent Service | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 8:22:53 AM. Contact: ###-####.
|
ELE03-03911
| Rough-In Permanent Service | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PASS |
|
|
tom ###-####, mechanical room door is open. ps ok for meter 12/9/2003 4:00:24 PM
|
ELE03-03824
| Final | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PASS |
|
|
|
ELE03-03824
| Rough-In Permanent Service | 12/4/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PASS |
|
|
We enclosed 2 open-air splices in attic in j-boxes. Replaced the existing hallway smoky with a new one and wired from it to a new smoky in the bedroom nearest the garage. Replaced the ceiling box for the living room paddle fan with a Fansafe box, and replaced the extension cord that fed it with romex. Wired in a new switch to control the existing garage light. Customer requests inspection be as close to 1:00 PM as possible. Thanks!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|