BLD03-02174
| BLD-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | | CANC |
|
|
|
BLD03-01734
| BLD-Final | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | FAIL |
|
|
posted c/n to have glass company provide listings etc for safety film on glass . alternate to safety glass. 12/9/2003 11:16:21 AM 12/9/2003 11:17:18 AM
|
BLD03-02467
| BLD-Final | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 12:36:19 PM. Contact: ###-####. needs all required signatures. 12/10/2003 9:19:31 AM
|
BLD03-02014
| BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | PART |
|
|
Larry --- please call first for access. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. walls ok , 1 hr shaft not built. 12/9/2003 4:31:13 PM
|
BLD03-01135
| BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 1:45:10 PM. Contact: ###-####.
|
BLD03-01135
| BLD-Energy code compliance | 12/8/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 1:45:53 PM. Contact: ###-####.
|
BLD03-00781
| BLD-Framing/Rough-in | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman, most of roof ok , needs nailing at top, over center shear,will recall also questioned engineer about hold down placement and exterior shear waiting for call back from Keith Jones. 12/9/2003 4:53:36 PM 12/9/2003 4:55:03 PM
|
BLD03-00748
| BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 8:38:53 AM. Contact: ###-####. Ok perm oc. 12/9/2003 2:16:31 PM
|
BLD03-00706
| BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 11:07:15 AM. Contact: ###-####. Ok for temp pending schell core and mec for a perm. 12/10/2003 9:22:41 AM
|
BLD03-01135
| BLD-Energy code compliance | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PART |
|
|
Ok pending new com check report. 12/9/2003 2:17:29 PM
|
BLD03-02467
| BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PART |
|
|
Ok temp oc needs mec and special inspection final report needs to be stamped by MTI engineer. also 2 doors need threshold touch up contractor on site. 12/10/2003 9:25:47 AM
|
BLD03-02215
| BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 12:00:00 AM | P | PART |
|
|
Ok temp oc pending mec for final and schell core. 12/10/2003 9:29:17 AM
|