Inspections for the day of: Friday, December 9, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02867 FIRE-Final Inspection12/9/200512/9/200512/12/2005 7:53:46 AMPNR
Inspection to be rescheduled, need paperwork regarding the hood suppression system.
BLD05-02317 FIRE-Final Inspection12/8/200512/9/200512/9/2005 4:06:29 PMPPART
The fire rated exit corridor must meet the approved plan set design and requirements, the restrooms adjacent to the bar are not yet completed at this time, remaining items on correction notice are complete.
BLD05-02519 FIRE-Final Inspection12/8/200512/9/200512/9/2005 3:20:55 PMPPASS
Fire life safety finaled, inspection passed.
FIR05-00162 INSP-Final Inspection12/8/200512/9/200512/9/2005 2:45:07 PMPPART
The two added heads in the bakery to meet correct spacing requirements are satisfactory.
BLD05-02866 FIRE-Final Inspection12/9/200512/9/200512/9/2005 2:35:30 PMPPASS
Fire life safety passed inspection, the existing hood system meets requirements.
FIR05-00190 INSP-Sprinkler Rough-in/Hydro12/9/200512/9/200512/9/2005 12:36:06 PMPPART
Overhead rough-in at the mens locker room and rooms adjacent to the elevator as marked on approved plans are acceptable to cover.
BLD05-02345 FIRE-Final Inspection12/7/200512/9/200512/9/2005 11:15:34 AMAPASS
Life safety is satisfactory.
BLD05-02346 FIRE-Final Inspection12/7/200512/9/200512/9/2005 10:58:58 AMAPART
The new drop ceiling installation has blocked the existing SW sprinkler heads, will require a fire sprinkler permit to modify the system to correct this issue. No ceiling tile is to be installed and no final on this permit until corrections are made.
BLD05-01731 FIRE-Conference12/8/200512/9/200512/9/2005 9:39:14 AMADONE
On site discussion regarding life safety requirements and alarm related issues for the new manlift.