BLD08-00736
| FIRE-Final Inspection | 12/8/2008 | 12/9/2008 | 12/10/2008 11:12:09 AM | A | PASS |
|
|
Life safety passed.
|
FIR08-00006
| INSP-Final Inspection | 12/8/2008 | 12/9/2008 | 12/9/2008 4:09:29 PM | P | FAIL |
|
|
All of the smoke detectors and manual pull stations have been tested including phone line troubles and battery tourbles. Phone line one appears to have a problem. Audio/visuals need to be tested as well as end of line voltage. A map at the facp is required.
|
BLD08-01364
| FIRE-Final Inspection | 12/9/2008 | 12/9/2008 | 12/9/2008 3:36:33 PM | P | PASS |
|
|
LIfe safety passed
|
BLD08-02242
| FIRE-Final Inspection | 12/8/2008 | 12/9/2008 | 12/9/2008 3:36:05 PM | A | PASS |
|
|
Life safety passed
|
BLD08-01516
| FIRE-Final Inspection | 12/9/2008 | 12/9/2008 | 12/9/2008 3:35:42 PM | P | PASS |
|
|
Life safety passed
|
FIR07-00766
| INSP-Sprinkler Rough-in/Hydro | 12/9/2008 | 12/9/2008 | 12/9/2008 3:18:34 PM | P | PASS |
|
|
Permit finaled
|
FIR08-00500
| INSP-Sprinkler Rough-in/Hydro | 12/8/2008 | 12/9/2008 | 12/9/2008 11:18:34 AM | A | PASS |
|
|
The second floor hydro test passed. The first floor hydro test failed.
|
FIR08-00491
| INSP-Supply line flush | 12/8/2008 | 12/9/2008 | 12/9/2008 10:57:46 AM | A | PASS |
|
|
This inspection was actually for an underground hydro not an underground flush. The hydro test passed.
|