Inspections for the day of: Tuesday, December 9, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00448 General Inspection12/9/200812/9/200812/10/2008 10:34:50 AMAPASS
BLD08-01078 BLD-Energy code compliance12/9/200812/9/200812/10/2008 10:09:48 AMACANC
BLD08-02002 BLD-Footing12/9/200812/9/200812/9/2008 4:22:47 PMPNR
Scheduled by a contractor via Hello! on 12/9/2008 at 8:04:06 AM. Contact: ###-####.
ESC08-00793 Site Preparation12/9/200812/9/200812/9/2008 4:22:17 PMPNR
Ray Phone
BLD08-00684 BLD-Final12/9/200812/9/200812/9/2008 3:24:09 PMPNR
Kenny Phone ###-####
BLD08-02284 BLD-Final12/9/200812/9/200812/9/2008 3:14:37 PMPPASS
Panis hardware installed. ok for perm occ.
BLD08-00896 BLD-Framing/Rough-in12/9/200812/9/200812/9/2008 2:53:04 PMPPASS
Exterior wals ok to insulate. Noticed issues with handrails to mezz. Electrical panels placed were extensions will be. Needs to reverse panels or move panels.
ESC08-00365 Random Inspection12/9/200812/9/200812/9/2008 2:49:32 PMPPASS
BLD08-02036 BLD-Framing/Rough-in12/8/200812/9/200812/9/2008 11:11:56 AMAPART
Scheduled by a contractor via Hello! on 12/8/2008 at 4:19:25 PM. Contact: ###-####. Hat channel for furout on existing masonry walls ok. Also reveiwed special insp. reports for welding, conc. and epoxy. Allreports noted that areas inspected were in compliance.