BLD11-02454
| FIRE-Conference | 12/9/2011 | 12/9/2011 | 12/9/2011 3:30:34 PM | P | DONE |
|
|
Conversation with building rep. regarding noted correction items including door hardware, premise identification, etc.
|
BLD11-02482
| FIRE-Final Inspection | 12/7/2011 | 12/9/2011 | 12/9/2011 3:27:31 PM | A | PASS |
|
|
Fire life safety completed acceptable.
|
FIR11-00581
| INSP-Final Inspection | 12/7/2011 | 12/9/2011 | 12/9/2011 3:25:39 PM | A | PASS |
|
|
Adjustments including relocation of the K class extinguisher and kicker plate between the fryer and range completed while on site. Hood suppression system functioned properly under test conditions. Permit finaled.
|
FIR11-00582
| INSP-Final Inspection | 12/8/2011 | 12/9/2011 | 12/9/2011 3:20:25 PM | A | PASS |
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
FIR11-00622
| INSP-Final Inspection | 12/8/2011 | 12/9/2011 | 12/9/2011 3:19:26 PM | A | PASS |
|
|
Hood suppression system functioned correctly under test conditions. Inspection passed, permit finaled.
|
FIR08-00604
| INSP-Alarm Testing | 12/8/2011 | 12/9/2011 | 12/9/2011 3:17:33 PM | A | PART |
|
|
Correction items noted today include DH at building #2, three PS at the main riser, dampers at building 2 and 3 parking garage, inaccurate one line for initiating device point numbers. All SD and HD at building 1 and 4 tested okay, relocated trash chute heats at buildings 2 and 3 also tested okay.
|