BLD11-01251
| FIRE-Final Inspection | 12/8/2011 | 12/9/2011 | 12/9/2011 3:15:29 PM | A | PART |
|
|
The east side remodeled area life safety is passed.
|
FIR11-00371
| INSP-Sprinkler Rough-in | 12/9/2011 | 12/9/2011 | 12/9/2011 3:15:03 PM | P | PASS |
|
|
Javier did not have the original copies of the approved plans. I let him know I will need them for the next inspection. I did however mark the copies he had the areas where sprinkler piping can be covered.
|
FIR11-00607
| INSP-Supply line flush | 12/9/2011 | 12/9/2011 | 12/9/2011 2:51:07 PM | P | PASS |
|
|
The underground supply piping is ok to cover. No flush was performed.
|
BLD11-02904
| FIRE-Final Inspection | 12/9/2011 | 12/9/2011 | 12/9/2011 2:49:58 PM | P | PASS |
|
|
life safety passed
|
FIR11-00435
| INSP-Sprinkler Rough-in | 12/8/2011 | 12/9/2011 | 12/9/2011 2:31:20 PM | A | CANC |
|
|
Wrong permit called in for inspection. The fire sprinkler was intended.
|
FIR11-00464
| INSP-Sprinkler Rough-in/Hydro | 12/8/2011 | 12/9/2011 | 12/9/2011 2:28:23 PM | A | PASS |
|
|
Hydro test on overhead system passed.
|
FIR11-00555
| INSP-Final Inspection | 12/6/2011 | 12/9/2011 | 12/9/2011 11:31:09 AM | A | FAIL |
|
|
No actual testing of devices was performed due to no approved plans/notes on site. I noted one strobe overspaced and that two manual pull stations had been added at two exterior doors. As-builts are required prior to a final sign off.
|
FIR11-00297
| INSP-Final Inspection | 12/8/2011 | 12/9/2011 | 12/9/2011 11:25:43 AM | A | FAIL |
|
|
Still need the Building A devices display and report as Building A as per the original correction notice.
|
BLD11-02636
| FIRE-Final Inspection | 12/9/2011 | 12/9/2011 | 12/9/2011 10:43:06 AM | P | PASS |
|
|
Life safety passed.
|
FIR11-00656
| INSP-Final Inspection | 12/8/2011 | 12/9/2011 | 12/9/2011 10:03:50 AM | A | PASS |
|
|
permit finaled.Hood suppression system functioned correctly
|