BLD13-03405
| BLD-Energy code compliance | 12/9/2014 | 12/9/2014 | 12/9/2014 4:46:22 PM | P | PASS |
|
|
5th floor phase 1 ok
|
BLD14-03322
| BLD-Conference | 12/8/2014 | 12/9/2014 | 12/9/2014 4:09:30 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ira Rutledge
|
BLD14-03322
| DOC - Permit Finaled | 12/9/2014 | 12/9/2014 | 12/9/2014 4:08:54 PM | P | PASS |
|
|
|
BLD14-00904
| BLD-Final | 12/9/2014 | 12/9/2014 | 12/9/2014 4:07:49 PM | P | NR |
|
|
sign off card is right inside the building//Jim Phone #: ###-####
|
BLD13-00181
| BLD-Energy code compliance | 12/9/2014 | 12/9/2014 | 12/9/2014 4:00:36 PM | P | PASS |
|
|
insulation third floor wing C and D// JC Phone #: ###-####coridor
|
BLD13-00181
| BLD-Ceiling Grid Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 3:59:59 PM | P | PASS |
|
|
second floor wing D// JC Phone #: ###-####
|
BLD14-02671
| BLD-Final | 12/8/2014 | 12/9/2014 | 12/9/2014 3:07:45 PM | P | FAIL |
|
|
Please call 30 minutes prior to inspection for access code. Thanks Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy need door hardware/exit path/address#
|
BLD13-01666
| BLD-Final | 12/9/2014 | 12/9/2014 | 12/9/2014 2:27:50 PM | P | NR |
|
|
Chad Phone #: ###-####
|
BLD14-00554
| BLD-Foundation | 12/9/2014 | 12/9/2014 | 12/9/2014 1:31:37 PM | P | PASS |
|
|
Mike-rebar Phone #: ###-####2nd lift ok
|
BLD14-01724
| BLD-Footing | 12/8/2014 | 12/9/2014 | 12/9/2014 11:09:46 AM | A | PASS |
|
|
Brian Phone #: ###-####
|
BLD14-03532
| BLD-Final | 12/8/2014 | 12/9/2014 | 12/9/2014 10:12:59 AM | A | PASS |
|
|
Dan Phone #: ###-####
|
BLD14-03532
| DOC - Permit Finaled | 12/9/2014 | 12/9/2014 | 12/9/2014 10:12:47 AM | P | PASS |
|
|
|
BLD13-03405
| BLD-Energy code compliance | 12/8/2014 | 12/9/2014 | 12/9/2014 9:44:08 AM | A | PASS |
|
|
Unit insulation at tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD14-02926
| BLD-Footing | 12/9/2014 | 12/9/2014 | 12/9/2014 12:00:00 AM | A | PASS |
|
|
Concrete placement on 11/25 has been supported with engineering stamped documents from the engineer of record and engineer/owner of special inspection firm.
|