ELE11-01079
| ELE-Aging Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 3:29:42 PM | | DONE |
|
|
still under construction
|
ELE14-03219
| Electrical Rough-In | 12/9/2014 | 12/9/2014 | 12/9/2014 2:44:09 PM | P | PASS |
|
|
Underslab electrical. Contact is Justin Bieker. Phone #: ###-#### Inspection requested via web by Richard Montgomery ok cover u/g ne part slab anop
|
ELE14-01816
| Conference | 12/9/2014 | 12/9/2014 | 12/9/2014 2:20:52 PM | P | DONE |
|
|
Skilled Nursing building "J" conference on Spa room J108. Call Lonny when on-site. Phone #: ###-#### Inspection requested via web by Lonny Baum talked about and looked at spa area, wrote correction notice,NEC 680.43(A) receptacles shall be at least 6' from inside walls of spa, and be gfci protected, 680.43(B) luminaires shall be gfci protected if less than 7'-6" from spa, shall have glass or plastic globe and be suitable for use in a damp location, 680.43(C) switches shall be at least 5' from inside walls of spa
|
ELE14-01814
| Electrical Rough-In | 12/9/2014 | 12/9/2014 | 12/9/2014 1:51:23 PM | P | PASS |
|
|
Rough-in ceiling inspection IL building area "E" 2nd floor corridor E251 ; 3rd floor corridor E351. Call Lonny when on-site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover upper level ceiling as requested
|
ELE14-01812
| Electrical Rough-In | 12/9/2014 | 12/9/2014 | 12/9/2014 1:18:30 PM | P | PASS |
|
|
Rough-in ceiling soffit inspection for IL 2nd floor area "B" rooms: B200, B201, B202, B203, B204, B205, B206, B207, ; B209. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ceiling soffits ok cover as requested
|
ELE14-03384
| Rough-In Permanent Service | 12/9/2014 | 12/9/2014 | 12/9/2014 12:25:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn ri ok, p/s u/g n ok
|
ELE14-03265
| Final | 12/8/2014 | 12/9/2014 | 12/9/2014 10:34:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan ok final
|
ELE14-03095
| Final | 12/8/2014 | 12/9/2014 | 12/9/2014 9:55:28 AM | A | PASS |
|
|
David Phone #: ###-#### ok final
|
ELE14-03142
| Electrical Rough-In | 12/8/2014 | 12/9/2014 | 12/9/2014 9:23:49 AM | A | PASS |
|
|
Wall Cover. Toby is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen walls and ceilings ok cover
|
ELE14-03056
| Final | 12/8/2014 | 12/9/2014 | 12/9/2014 8:43:05 AM | A | FAIL |
|
|
Jay// space 5 Phone #: ###-#### called, left message, NEC 210.8(B)(2) all receptacles in kitchen shall be gfci, 406.(D) receptacle faceplates shall be flush with or project from receptacle, BCC shall not cover ceiling prior to inspection, receptacles shall operate, complete panel schedule, provide light switches for dining area and identify, strap mc cable within 12" of box, verify convenience receptacle within 25' of rooftop units
|