Inspections for the day of: Tuesday, December 9, 2014.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01666 FIRE-Final Inspection12/2/201412/3/2014 A 
Chad Phone #: ###-####
FIR14-00735 INSP-Sprinkler Rough-in12/8/201412/9/201412/9/2014 5:09:30 PMPFAIL
Numerous field modifications to main, and branchline routing, deleted and added heads including branchlines at several locations, major elevation changes not indicated, changes to types of heads installed at specific areas- Need to provide a resubmittal prior to rough-in and cover inspection approval. Some areas incomplete, missing sprinklers, two eves are not covered.
BLD14-02671 FIRE-Final Inspection12/9/201412/9/201412/9/2014 3:09:04 PMPPASS
Fire life safety okayed pending approved style hardware is installed at the marked exits east side of building- to be done prior to structural final.
FIR14-00675 INSP-Final Inspection12/9/201412/9/201412/9/2014 2:30:30 PMPPASS
Fire sprinkler permit finaled.
BLD14-03462 FIRE-Final Inspection12/8/201412/9/201412/9/2014 1:40:48 PMPPASS
Life safety inspection passed provided hardware at the door to the shared restrooms is reversed to allow free egress. This to be finished prior to structural final as discussed.
FIR14-00858 INSP-Sprinkler Rough-in12/8/201412/9/201412/9/2014 11:57:25 AMPCANC
This is an ug to cover. Bryan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
BLD14-02959 FIRE-Final Inspection12/8/201412/9/201412/9/2014 11:25:46 AMAPASS
Scope of remodel work completed. Fire life safety inspection passed.
FIR14-00816 INSP-Final Inspection12/8/201412/9/201412/9/2014 10:01:55 AMAPASS
Fire sprinkler permit finaled.
FIR14-00499 INSP-Final Inspection12/8/201412/9/201412/9/2014 10:00:17 AMAPASS
Fire sprinkler permit finaled.