ELE12-01786
| ELE-Aging Inspection | 12/9/2015 | 12/9/2015 | 12/10/2015 9:21:16 AM | | DONE |
|
|
too busy
|
GCE15-00151
| GCE-Final | 12/9/2015 | 12/9/2015 | 12/10/2015 8:36:30 AM | P | PASS |
|
|
Terry ###-#### code: 3484 final ok
|
GCE15-00151
| GCE-Final | 12/9/2015 | 12/9/2015 | 12/9/2015 3:59:34 PM | P | PASS |
|
|
Terry ###-#### final ok
|
GCE15-00171
| GCE-Rough-In | 12/9/2015 | 12/9/2015 | 12/9/2015 3:02:16 PM | P | FAIL |
|
|
Greg ###-#### 210.52(G)(1)- the branch circuit supplying garage receptacles shall not supply outlets outside of the garage. metal boxes shall be grounded at rough in stage 320.23(A)- cables run within 6 foot of attic crawl shall be protected with gaurd strips. remove all drywall covering full length of nm cable not yet inspected
|
GCE15-00112
| GCE-Permanent Service | 12/9/2015 | 12/9/2015 | 12/9/2015 2:14:12 PM | P | FAIL |
|
|
Bob ###-#### still need fire sprinkeler riser bonded and available fault current info label
|
GCE15-00112
| GCE-Rough-In | 12/9/2015 | 12/9/2015 | 12/9/2015 2:11:54 PM | P | PASS |
|
|
Bob ###-#### r/i walls ok upst. offices and corridor see sheet A2.1 pink highlighted areas
|
ELE15-03695
| Electrical Rough-In | 12/9/2015 | 12/9/2015 | 12/9/2015 1:09:48 PM | P | PASS |
|
|
Walls only inspection Phone #: ###-#### Inspection requested via web by Nick Larson r/i ok walls
|
ELE15-02918
| Final | 12/8/2015 | 12/9/2015 | 12/9/2015 12:44:10 PM | P | PASS |
|
|
ARC FAULT Breakers were installed. Phone #: ###-#### Inspection requested via web by Daniel Schaffeld corrections made final ok
|
ELE15-03769
| Final | 12/8/2015 | 12/9/2015 | 12/9/2015 10:39:20 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Sellman as per manufacturer- 50 amp maximum on top position of all in one. Relocate 80 amp breaker and turn on 200 amp main. 250 .94- intersystem bus bar required
|
ELE15-02606
| Final | 12/8/2015 | 12/9/2015 | 12/9/2015 9:54:05 AM | A | PASS |
|
|
Please call Mitch at ###-#### 30 minutes before. Phone #: ###-#### Inspection requested via web by Mitch Whited correction made final ok
|
ELE15-02604
| Final | 12/8/2015 | 12/9/2015 | 12/9/2015 9:37:48 AM | A | PASS |
|
|
Jake is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates corrections made final ok perm. occupancy ok
|
ELE15-03525
| Electrical Rough-In | 12/8/2015 | 12/9/2015 | 12/9/2015 9:08:54 AM | A | PASS |
|
|
Luke on site. Phone #: ###-#### Inspection requested via web by Clint Tate r/i ok both bathroom ceilings, POS counters and lobby wall opposite POS area
|
ELE15-02903
| Final | 12/9/2015 | 12/9/2015 | 12/9/2015 8:50:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder final ok
|