Inspections for the day of: Wednesday, December 9, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03286 BLD-Final12/9/201512/9/201512/10/2015 8:16:00 AMPNR
Due to a secondary slab that averaged 15" thick under the top slab, footings were no longer needed and columns were bolted down. We have documentation on site. Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD15-04079 BLD-Framing/Rough-in12/8/201512/9/201512/9/2015 3:20:39 PMPPASS
Bob Phone #: ###-####. Interior steel stud framed walls for new offices and breakroom only ok.
BLD15-02561 BLD-Framing/Rough-in12/8/201512/9/201512/9/2015 3:09:16 PMPFAIL
Kelly Phone #: ###-####. Provide fix ffrom joist manufacturer for cut top chords on floor joist in unit 102. Fire caulk in riser room, Complete draft stop in attic above tub, unit 104. Correction notice posted, ok to insulate.
BLD15-00723 BLD-Ceiling Grid Inspection12/9/201512/9/201512/9/2015 2:25:00 PMPPASS
Brent Phone #: ###-####. East offices only ok.
BLD15-01213 BLD-Foundation12/9/201512/9/201512/9/2015 1:30:41 PMPPART
Rebar // Dave Phone #: ###-####. No plans or new engineering on site. Per Bob Archibald, allowed concrete to be placed, but engineering will be required prior to final inspection. Footings were approx. 4ft.x4ft. 34inches to 42 inches deep with two mats of 4#5 rebar each way.
BLD15-04082 BLD-Final12/8/201512/9/201512/9/2015 1:26:49 PMPPASS
Gari-please call 30 minutes prior for access Phone #: ###-####
BLD15-04082 DOC - Permit Finaled12/9/201512/9/201512/9/2015 1:25:59 PMPPASS
BLD15-03903 BLD-Foundation12/8/201512/9/201512/9/2015 11:24:43 AMPPART
Dame Phone #: ###-####
BLD15-04181 BLD-Footing12/8/201512/9/201512/9/2015 11:12:36 AMAPASS
would like call ahead; Warren Phone #: ###-####