ELE17-03084
| ELE-Aging Inspection | 12/9/2019 | 12/9/2019 | 12/12/2019 6:08:51 AM | | DONE |
|
|
Please call with progress on job.
|
ELE19-04613
| Conference | 12/6/2019 | 12/9/2019 | 12/9/2019 2:40:54 PM | P | DONE |
|
|
call ahead // Richard Phone #: ###-#### Discussed requirements for new service on detached garage. 1.GEC and grd rods. 2. Wire size 3 Number of required circuits and size in garage.
|
ELE19-04389
| Permanent Service | 12/9/2019 | 12/9/2019 | 12/9/2019 12:55:36 PM | P | PASS |
|
|
CALL JAMES FOR QUESTIONS ###-#### Phone #: ###-#### Inspection requested via web by Lori Stout Service moved to newly constructed detached garage to re-feed house. p/s o/h n ok
|
ELE19-04649
| Permanent Service | 12/6/2019 | 12/9/2019 | 12/9/2019 12:54:27 PM | P | PASS |
|
|
Contact: Jason Noble Phone #: ###-#### Inspection requested via web by Deb Gooden Short section over walkable roof. IDP mentioned to contractor about 6' max height. p/s o/h rec ok
|
ELE19-04607
| Final | 12/6/2019 | 12/9/2019 | 12/9/2019 10:39:27 AM | A | PASS |
|
|
Please contact Troy with any question or concerns. Thank You! Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Bob Glenn Ok final. Panel labeled, intersystem installed.
|
ELE19-04668
| Electrical Rough-In | 12/6/2019 | 12/9/2019 | 12/9/2019 9:42:27 AM | A | PASS |
|
|
Jose Phone #: ###-#### Ok cover ceiling for 2 offices, reception and break room 8th flr.
|
ELE19-04690
| Final | 12/8/2019 | 12/9/2019 | 12/9/2019 9:23:59 AM | A | NR |
|
|
Phil Lansing Home Owner ###-#### Phone #: ###-#### Inspection requested via web by Jon G. Hoene Need to bring 1 ea components to verify UL listing. A RI inspection is required prior to installation. Tried to call, voicemail was full.
|
ELE19-04710
| Temporary Service | 12/9/2019 | 12/9/2019 | 12/9/2019 8:53:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder Sticker inside. t/s u/g n ok
|
ELE16-00500
| ELE-Aging Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 5:27:34 AM | | DONE |
|
|
4th attempt. List was sent to contractor of afing inspections that need to be taken care of. Please coordinate and schedule a final inspection.
|