BLD99-03003
| BLD-Energy code compliance | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | A | FAIL |
|
|
Late am if possible. Jerry- ###-####. need sprinkler r\i called rick he left c\n told bldr to recall 2/3/00 7:25:36 AM
|
MEC00-00285
| Rough-in | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 09:12:47. Contact: ###-####. conf with htg cont. fp ok 2/1/00 3:10:37 PM
|
BLD00-00009
| BLD-Foundation | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | A | PART |
|
|
found --jack -###-#### poured owner supposedly has photos as russ unable to inspect on 1-31-200 looks ok 2/1/00 3:09:01 PM
|
BLD99-03478
| BLD-Framing/Rough-in | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 13:34:56. Contact: ###-####. c\n ok 2/1/00 3:10:06 PM
|
BLD99-03734
| BLD-Wall cover | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 14:49:07. Contact: ###-####. 407 area nailing ok c\n need add retro h-d and clarify single hd at garage panels 2/1/00 3:09:40 PM
|
BLD99-03707
| BLD-Foundation | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 18:09:14. Contact: ###-####. 407 area ftg poured walls ok steel ok unable to verify set back 2/3/00 7:25:02 AM
|
BLD99-00682
| BLD-Framing/Rough-in | 2/1/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | P | PART |
|
|
###-#### 1 hr lid at stairs 1st layer ok 2/3/00 7:28:01 AM
|
BLD00-00165
| BLD-Footing | 2/1/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | P | PART |
|
|
Curt Barber; ###-####. sent to 408 2/3/00 7:28:32 AM
|
BLD99-02606
| BLD-Conference | 2/1/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 10:02:08. Contact: ###-####. c\n 1 hr walls 2/3/00 7:28:50 AM
|
BLD99-03137
| BLD-Conference | 2/1/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 10:03:29. Contact: ###-####. fire blocksok extend litr const. at pl walls ok to continue 2/3/00 7:27:39 AM
|
BLD99-01410
| BLD-Final | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 08:10:00. Contact: ###-####. g\n temp glass firestops etc ok to t\o 2/3/00 7:29:15 AM
|
BLD99-02842
| BLD-Framing/Rough-in | 1/31/2000 | 2/1/2000 | 2/1/2000 12:00:00 AM | P | FAIL |
|
|
Larry Weisgerber- ###-####. c\n truss bracing headers at brg wall etc 2/3/00 7:29:37 AM
|