Inspections for the day of: Friday, February 1, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-04065 Final1/31/20022/1/20022/1/2002 12:00:00 AMAPASS
###-#### KEY IN FRONT ELECTRICAL BOX BY ENTRY WAY
PLM01-04176 Final1/31/20022/1/20022/1/2002 12:00:00 AMAPASS
###-####
PLM02-00235 Water and/or Sewer1/31/20022/1/20022/1/2002 12:00:00 AMPPASS
###-####
PLM01-04100 Final2/1/20022/1/20022/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/01/2002 at 08:00:06. Contact: ###-####.
PLM02-00237 Plumbing Rough-in2/1/20022/1/20022/1/2002 12:00:00 AMPFAIL
###-#### washer box branch fitting is in backwards, provide a sump in the basement for water heater t&p drain and water heater leakage, cap off all existing waste openings in the basement. 2/1/2002 4:02:15 PM
PLM02-00238 Plumbing Rough-in2/1/20022/1/20022/1/2002 12:00:00 AMPFAIL
###-#### r-13 min required between sheeting and tub valve, no tests on yet 2/1/2002 4:45:29 PM
PLM02-00170 Water and/or Sewer2/1/20022/1/20022/1/2002 12:00:00 AMPPASS
PLM02-00212 Plumbing Rough-in2/1/20022/1/20022/1/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/01/2002 at 09:36:08. Contact: ###-####.
PLM02-00243 Water and/or Sewer2/1/20022/1/20022/1/2002 12:00:00 AMPPASS
###-####