BLD01-01633
| BLD-Final | 1/31/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | A | PASS |
|
|
JIM ###-#### PLEASE CALL BEFORE AS YOU WILL NEED AN ACCESS CARD...shows pub wks on card...why? struct ok 2/1/2002 1:40:23 PM
|
BLD01-00234
| BLD-Conference | 1/31/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 340 On 1/31/2002 5:55:22 PM , complete c/n prior to grid tile 2/1/2002 4:59:35 PM
|
BLD01-00186
| BLD-Conference | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/1/2002 8:59:53 AM rec'd proper flood cert, ok
|
BLD01-03227
| BLD-Conference | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/1/2002 9:58:05 AM need fire, not struct
|
BLD01-02049
| BLD-Conference | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/1/2002 11:13:28 AM w/ bldr re frame & finals...need other insps 1st
|
BLD00-02189
| BLD-Final | 1/31/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 10:59:29. Contact: ###-####...struct ok ( fire ok per Rick J.) referred to P&Z for final 2/1/2002 11:38:41 AM
|
BLD01-02453
| BLD-Framing/Rough-in | 1/31/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | P | NR |
|
|
MARTY ###-#### ...need verify elec approved or N.A. 2/1/2002 4:49:35 PM
|
BLD01-02048
| BLD-Conference | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/1/2002 4:46:45 PM w/ arch's intern re plans and corrections, see c/n w/ BLD01-02049
|
BLD00-03361
| BLD-Conference | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/1/2002 4:56:22 PM w/ wendell re resubmittal: canopy, need valuation, add'l spec insp or eng's insp report for framing changes.
|
BLD00-03361
| BLD-Framing/Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/1/2002 4:58:42 PM shell...canopy only, need eng's verifications as built.
|
BLD01-02425
| BLD-Framing/Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 09:19:16. Contact: ###-####...no air seal, recall. complete c/n 2/1/2002 5:36:55 PM
|
BLD01-02049
| BLD-Final | 2/1/2002 | 2/1/2002 | 2/1/2002 12:00:00 AM | P | FAIL |
|
|
###-####, c/n stair rails, modifications, other finals not complete... 2/1/2002 4:49:00 PM
|
BLD01-01434
| BLD-Final | 1/31/2002 | 2/1/2002 | 1/31/2002 12:00:00 AM | A | CANC |
|
|
1062 ENTER TOUCH PAD JOE ###-#### JOE CALLED TO CANCEL THIS INSPECTION ,WILL RECALL WHEN READY 1-31-02 ///DLD
|