Inspections for the day of: Friday, February 1, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01633 BLD-Final1/31/20022/1/20022/1/2002 12:00:00 AMAPASS
JIM ###-#### PLEASE CALL BEFORE AS YOU WILL NEED AN ACCESS CARD...shows pub wks on card...why? struct ok 2/1/2002 1:40:23 PM
BLD01-00234 BLD-Conference1/31/20022/1/20022/1/2002 12:00:00 AMAPASS
Scheduled by Inspector: 340 On 1/31/2002 5:55:22 PM , complete c/n prior to grid tile 2/1/2002 4:59:35 PM
BLD01-00186 BLD-Conference2/1/20022/1/20022/1/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/1/2002 8:59:53 AM rec'd proper flood cert, ok
BLD01-03227 BLD-Conference2/1/20022/1/20022/1/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/1/2002 9:58:05 AM need fire, not struct
BLD01-02049 BLD-Conference2/1/20022/1/20022/1/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/1/2002 11:13:28 AM w/ bldr re frame & finals...need other insps 1st
BLD00-02189 BLD-Final1/31/20022/1/20022/1/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/31/2002 at 10:59:29. Contact: ###-####...struct ok ( fire ok per Rick J.) referred to P&Z for final 2/1/2002 11:38:41 AM
BLD01-02453 BLD-Framing/Rough-in1/31/20022/1/20022/1/2002 12:00:00 AMPNR
MARTY ###-#### ...need verify elec approved or N.A. 2/1/2002 4:49:35 PM
BLD01-02048 BLD-Conference2/1/20022/1/20022/1/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/1/2002 4:46:45 PM w/ arch's intern re plans and corrections, see c/n w/ BLD01-02049
BLD00-03361 BLD-Conference2/1/20022/1/20022/1/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/1/2002 4:56:22 PM w/ wendell re resubmittal: canopy, need valuation, add'l spec insp or eng's insp report for framing changes.
BLD00-03361 BLD-Framing/Rough-in2/1/20022/1/20022/1/2002 12:00:00 AMPPART
Added by Inspector: 340 On 2/1/2002 4:58:42 PM shell...canopy only, need eng's verifications as built.
BLD01-02425 BLD-Framing/Rough-in2/1/20022/1/20022/1/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/01/2002 at 09:19:16. Contact: ###-####...no air seal, recall. complete c/n 2/1/2002 5:36:55 PM
BLD01-02049 BLD-Final2/1/20022/1/20022/1/2002 12:00:00 AMPFAIL
###-####, c/n stair rails, modifications, other finals not complete... 2/1/2002 4:49:00 PM
BLD01-01434 BLD-Final1/31/20022/1/20021/31/2002 12:00:00 AMACANC
1062 ENTER TOUCH PAD JOE ###-#### JOE CALLED TO CANCEL THIS INSPECTION ,WILL RECALL WHEN READY 1-31-02 ///DLD