Inspections for the day of: Wednesday, February 1, 2006.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-00342 Final1/31/20062/1/20062/1/2006 4:32:27 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final
ELE05-04116 Final2/1/20062/1/20062/1/2006 4:16:04 PMPPASS
pat; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to final
ELE05-03807 ELE-Aging Inspection2/1/20062/1/20062/1/2006 3:43:23 PM NR
elev suc
ELE05-03810 ELE-Aging Inspection2/1/20062/1/20062/1/2006 3:42:46 PM DONE
see final
ELE06-00309 Conference2/1/20062/1/20062/1/2006 2:50:57 PMPDONE
homeonwer ###-#### please inspect conduit to barn; Phone #: ###-#### Internet Inspection Request from: William Zerfas looked at u/g, see ri
ELE05-04323 Final2/1/20062/1/20062/1/2006 2:36:07 PMPCANC
Scheduled by a contractor via Hello! on 2/1/2006 at 7:45:45 AM. Contact: ###-####. talked about ti spaces and power for heaters, told to run temporary until ti spaces are ready.
ELE05-04323 Rough-In Permanent Service2/1/20062/1/20062/1/2006 2:31:43 PMPCANC
Scheduled by a contractor via Hello! on 2/1/2006 at 7:44:46 AM. Contact: ###-####. nr talked about ti spaces
ELE06-00370 Temporary Service2/1/20062/1/20062/1/2006 1:01:08 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Bob Glenn t/s u/g n ok
ELE06-00292 Conference1/31/20062/1/20062/1/2006 8:55:57 AMADONE
Scheduled by a contractor via Hello! on 1/31/2006 at 11:09:18 PM. Contact: ###-####. looked at sub-panel location, and sump pump and agreed to afci since it will be in bedroom.
ELE06-00366 Rough-In Permanent Service1/31/20062/1/20062/1/2006 8:37:05 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Dan Rohl called contr about 1 wire to staple and recpt in dining room. ric ok, p/s u/g n ok
ELE04-02804 Final2/1/20062/1/20062/1/2006 12:00:00 AMPPASS
bldg empty, was t/s, ok to final
ELE06-00309 Electrical Rough-In2/1/20062/1/20062/1/2006 12:00:00 AMPPASS
homeonwer ###-#### please inspect conduit to barn; Phone #: ###-#### Internet Inspection Request from: William Zerfas u/g from house to barn ok
ELE05-03810 Final2/1/20062/1/20062/1/2006 12:00:00 AMPPASS
looked at signs, ok to final