Inspections for the day of: Wednesday, February 1, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00035 FIRE-Final Inspection1/31/20062/1/20062/1/2006 3:32:26 PMPFAIL
Tag fire extinguisher and repair the existing exit signs. Sprinkler heads are overspaced in locations marked by me on the plans. Provide permit for fire sprinkler work. Fire alarm work has been performed without a permit. Mary and I walked the job and she is aware of the problem. Jeff with CSDI stated to me that he directed the electrician to perform the work.
FIR05-00839 INSP-Sprinkler Rough-in/Hydro2/1/20062/1/20062/1/2006 2:08:31 PMPPASS
Underground hydro and flush passed
BLD04-03010 FIRE-Final Inspection2/1/20062/1/20062/1/2006 2:08:05 PMPPASS
Permit finaled
FIR06-00042 INSP-Final Inspection1/31/20062/1/20062/1/2006 10:32:34 AMAPASS
permit finaled
BLD05-01860 FIRE-Final Inspection1/31/20062/1/20062/1/2006 9:52:36 AMAPART
A temporary occupancy was given with Dave Hannimans permission until the curbing has been corrected for fire dept access.
BLD05-01859 FIRE-Final Inspection1/31/20062/1/20062/1/2006 9:51:38 AMAPASS
Permit finaled