ELE07-03466
| ELE-Aging Inspection | 2/1/2010 | 2/1/2010 | 2/8/2010 6:37:49 AM | | DONE |
|
|
no activity, see doc expire
|
ELE07-03617
| ELE-Aging Inspection | 2/1/2010 | 2/1/2010 | 2/2/2010 3:12:50 PM | | DONE |
|
|
no activity, see doc expire
|
ELE09-02348
| Conference | 2/1/2010 | 2/1/2010 | 2/2/2010 6:28:42 AM | P | DONE |
|
|
Eric Phone #: ###-#### went to job, called contractor, contractor has too many loose ends for inspection at this tme- told him to close openings in boxes, get the listings for equipment so we can see them where they are labelled, tighten receptacles, install flex properly, be sure no cord run to air handler, main breaker sized correctly, be sure to provide disconnects as required, provide access to electrical room as it is not to be used for storage, told to call when ready for inspection, no esc this project
|
ELE09-02348
| Final | 2/1/2010 | 2/1/2010 | 2/1/2010 4:03:12 PM | P | CANC |
|
|
Eric Phone #: ###-#### see conference
|
ELE10-00184
| Electrical Rough-In | 2/1/2010 | 2/1/2010 | 2/1/2010 3:55:47 PM | P | PASS |
|
|
Jay Phone #: ###-#### ri ok, no esc this project
|
ELE10-00184
| Final | 2/1/2010 | 2/1/2010 | 2/1/2010 3:55:35 PM | P | PASS |
|
|
Jay Phone #: ###-#### ok to final, no esc this project
|
ELE09-01657
| Electrical Rough-In | 2/1/2010 | 2/1/2010 | 2/1/2010 3:20:33 PM | P | PASS |
|
|
Eric Phone #: ###-#### corrections made, ric ok, u/g ok to cover
|
ELE09-02277
| Final | 2/1/2010 | 2/1/2010 | 2/1/2010 2:40:09 PM | P | PASS |
|
|
House is unoccupied and front door is open. Phone #: ###-#### Internet Inspection Request from: John Edwards called, ok to final, no esc this project
|
ELE10-00021
| Rough-In Permanent Service | 1/29/2010 | 2/1/2010 | 2/1/2010 2:18:02 PM | P | CANC |
|
|
Angel Phone #: ###-#### see p/s, wrong type request
|
ELE10-00021
| Permanent Service | 2/1/2010 | 2/1/2010 | 2/1/2010 1:37:09 PM | P | PASS |
|
|
Angel Phone #: ###-#### corrections made, p/s o/h rec ok, no esc this project
|
ELE09-01767
| Final | 1/29/2010 | 2/1/2010 | 2/1/2010 1:24:09 PM | P | PASS |
|
|
Chris is the contact his no is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final, signed card
|
ELE10-00110
| Rough-In Permanent Service | 2/1/2010 | 2/1/2010 | 2/1/2010 12:32:14 PM | P | PASS |
|
|
Thank You!! Phone #: ###-#### Internet Inspection Request from: Tracy Robertson ric ok, p/s u/g n ok
|
ELE09-02345
| Electrical Rough-In | 2/1/2010 | 2/1/2010 | 2/1/2010 10:32:19 AM | A | PASS |
|
|
Requesting a ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty met contractor, ok to cover ceilings
|
ELE10-00181
| Temporary Service | 2/1/2010 | 2/1/2010 | 2/1/2010 10:17:45 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson called, t/s o/h n ok, no esc this project
|
ELE10-00181
| Final | 1/29/2010 | 2/1/2010 | 2/1/2010 10:16:30 AM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson wrong type request, see t/s
|
ELE10-00179
| Rough-In Permanent Service | 1/29/2010 | 2/1/2010 | 2/1/2010 9:59:39 AM | A | PASS |
|
|
Ed Phone #: ###-#### ric ok p/s u/g n ok
|
ELE10-00178
| Rough-In Permanent Service | 1/29/2010 | 2/1/2010 | 2/1/2010 9:45:38 AM | A | PASS |
|
|
Ed Phone #: ###-#### ric ok, p/s u/g n ok
|
ELE10-00177
| Final | 1/29/2010 | 2/1/2010 | 2/1/2010 8:57:51 AM | A | PASS |
|
|
Repair undergound light pole circuits Phone #: ###-#### Internet Inspection Request from: Mark Sessions ok to final, no esc this project
|
ELE09-01932
| Electrical Rough-In | 1/29/2010 | 2/1/2010 | 2/1/2010 7:32:35 AM | A | PART |
|
|
Ceiling inspection. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates central part phase 7 ceiling only ok to cover
|
ELE09-01932
| Final | 2/1/2010 | 2/1/2010 | 2/1/2010 7:32:22 AM | A | PART |
|
|
Ceiling inspection. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates central part phase 7 only ok for t/o
|