Inspections for the day of: Monday, February 1, 2010.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00675 INSP-Final Inspection1/22/20101/25/2010 A 
trent Phone #: ###-####
BLD09-02248 FIRE-Final Inspection2/1/20102/1/20102/1/2010 4:23:09 PMPPASS
Correction notice items are complete, fire sprinkler deficiencies are repaired, missing ceiling tile to be in place prior to structural final as agreed. Fire life safety passed.
FIR10-00044 INSP-Final Inspection2/1/20102/1/20102/1/2010 4:21:23 PMPPASS
Overhead fire sprinkler modifications per the scope of work passed inspection. Both rough-in and final completed in conjunction. Permit final okay.
BLD07-00571 FIRE-Final Inspection2/1/20102/1/20102/1/2010 4:17:40 PMPPART
Project related fire alarm and sprinkler permits have been finaled.
BLD09-01705 FIRE-Final Inspection2/1/20102/1/20102/1/2010 4:16:44 PMPDONE
Site visit to verify missing escutcheons at pendent sprinkler heads have been installed. Inspection passed.
FIR10-00019 INSP-Sprinkler Rough-in/Hydro2/1/20102/1/20102/1/2010 4:14:32 PMAPART
Overhead modifications are approved for cover.
FIR09-00384 INSP-Final Inspection2/1/20102/1/20102/1/2010 4:13:46 PMAPART
FIR09-00642 INSP-Conference2/1/20102/1/20102/1/2010 4:12:44 PMADONE
Regarding UG supply pipe specs per NFPA ch. 8 and 10.
BLD07-00168 FIRE-Final Inspection2/1/20102/1/20102/1/2010 4:07:25 PMAPASS
Life safety inspection passed.