FIR09-00675
| INSP-Final Inspection | 1/22/2010 | 1/25/2010 | | A | |
|
|
trent Phone #: ###-####
|
BLD09-02248
| FIRE-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 4:23:09 PM | P | PASS |
|
|
Correction notice items are complete, fire sprinkler deficiencies are repaired, missing ceiling tile to be in place prior to structural final as agreed. Fire life safety passed.
|
FIR10-00044
| INSP-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 4:21:23 PM | P | PASS |
|
|
Overhead fire sprinkler modifications per the scope of work passed inspection. Both rough-in and final completed in conjunction. Permit final okay.
|
BLD07-00571
| FIRE-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 4:17:40 PM | P | PART |
|
|
Project related fire alarm and sprinkler permits have been finaled.
|
BLD09-01705
| FIRE-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 4:16:44 PM | P | DONE |
|
|
Site visit to verify missing escutcheons at pendent sprinkler heads have been installed. Inspection passed.
|
FIR10-00019
| INSP-Sprinkler Rough-in/Hydro | 2/1/2010 | 2/1/2010 | 2/1/2010 4:14:32 PM | A | PART |
|
|
Overhead modifications are approved for cover.
|
FIR09-00384
| INSP-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 4:13:46 PM | A | PART |
|
|
|
FIR09-00642
| INSP-Conference | 2/1/2010 | 2/1/2010 | 2/1/2010 4:12:44 PM | A | DONE |
|
|
Regarding UG supply pipe specs per NFPA ch. 8 and 10.
|
BLD07-00168
| FIRE-Final Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 4:07:25 PM | A | PASS |
|
|
Life safety inspection passed.
|