Inspections for the day of: Monday, February 1, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01219 FIRE-Conference2/1/20102/1/20102/1/2010 3:42:10 PMPDONE
Joe and I went over exit sign/emergency light placement
FIR09-00494 INSP-Sprinkler Rough-in2/1/20102/1/20102/1/2010 3:28:03 PMPPASS
The sprinkler piping above the gridded areas can be covered except for the small room with a grid ceiling in the west end of the building.
FIR09-00651 INSP-Sprinkler Rough-in2/1/20102/1/20102/1/2010 3:23:19 PMPPASS
Sprinkler piping is ok to cover. I noted that atleast two pendant heads in the small rooms are blocked by the surface mounted lights. Mike and Sam are going to provide longer 401 canopies to spray below the lights. I will check these on final.
FIR09-00575 INSP-Final Inspection1/29/20102/1/20102/1/2010 3:21:33 PMPPASS
permit finaled
FIR09-00448 INSP-Final Inspection1/29/20102/1/20102/1/2010 3:20:42 PMAPASS
Permit finaled.
BLD09-02250 FIRE-Final Inspection1/29/20102/1/20102/1/2010 11:07:37 AMAPASS
Life safety passed.
BLD09-01411 FIRE-Final Inspection1/29/20102/1/20102/1/2010 11:05:18 AMAFAIL
The last item to correct is the requirement for emergency lighting in the new area. A follow up inspection has been scheduled for friday to verify that the work has been completed. I have addressed this with Laurie.
BLD09-00945 FIRE-Final Inspection1/29/20102/1/20102/1/2010 11:00:36 AMAPART
The open office part of phase 6 life safety is passed and the storage area of phase 7 life safety is passed.