BLD09-01219
| FIRE-Conference | 2/1/2010 | 2/1/2010 | 2/1/2010 3:42:10 PM | P | DONE |
|
|
Joe and I went over exit sign/emergency light placement
|
FIR09-00494
| INSP-Sprinkler Rough-in | 2/1/2010 | 2/1/2010 | 2/1/2010 3:28:03 PM | P | PASS |
|
|
The sprinkler piping above the gridded areas can be covered except for the small room with a grid ceiling in the west end of the building.
|
FIR09-00651
| INSP-Sprinkler Rough-in | 2/1/2010 | 2/1/2010 | 2/1/2010 3:23:19 PM | P | PASS |
|
|
Sprinkler piping is ok to cover. I noted that atleast two pendant heads in the small rooms are blocked by the surface mounted lights. Mike and Sam are going to provide longer 401 canopies to spray below the lights. I will check these on final.
|
FIR09-00575
| INSP-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 3:21:33 PM | P | PASS |
|
|
permit finaled
|
FIR09-00448
| INSP-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 3:20:42 PM | A | PASS |
|
|
Permit finaled.
|
BLD09-02250
| FIRE-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 11:07:37 AM | A | PASS |
|
|
Life safety passed.
|
BLD09-01411
| FIRE-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 11:05:18 AM | A | FAIL |
|
|
The last item to correct is the requirement for emergency lighting in the new area. A follow up inspection has been scheduled for friday to verify that the work has been completed. I have addressed this with Laurie.
|
BLD09-00945
| FIRE-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 11:00:36 AM | A | PART |
|
|
The open office part of phase 6 life safety is passed and the storage area of phase 7 life safety is passed.
|