Inspections for the day of: Monday, February 1, 2010.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS10-00016 PLM-Final1/28/20102/1/20102/2/2010 8:56:42 AMAPASS
Vault has been sucked out.
ESC09-00770 INSP - Stop Work Order2/1/20102/1/20102/1/2010 4:30:17 PMPPASS
ESC09-00769 INSP - Stop Work Order2/1/20102/1/20102/1/2010 4:28:51 PMPPASS
ESC10-00004 General Inspection1/29/20102/1/20102/1/2010 1:55:30 PMAPASS
Site looks good. All stock pile have been covered with 10+ mill plastic.
ESC10-00005 Site Preparation2/1/20102/1/20102/1/2010 1:54:41 PM PART
Discussed with RP to keep up on sweeping. Prior to next storm event to have a sweep done on the street of the active areas within the sub division.
ESC09-00160 Random Inspection2/1/20102/1/20102/1/2010 1:53:50 PMPDONE
Left message for RP to contact me over pulling out the storm drain inlet protection so a Site Final can occur. Waiting on a call back.
ESC09-00788 BMP Violation1/27/20102/1/20102/1/2010 1:36:15 PMAPASS
ESC09-00565 BMP Violation1/27/20102/1/20102/1/2010 1:36:02 PMAPASS
ESC09-00787 BMP Violation1/27/20102/1/20102/1/2010 1:35:54 PMAPASS
ESC09-00786 BMP Violation1/27/20102/1/20102/1/2010 1:35:44 PMAPASS
ESC09-00720 Site Preparation1/27/20102/1/20102/1/2010 12:57:00 PMACANC
8:30am on 2/2/10 am.
ESC09-00812 Site Preparation1/28/20102/1/20102/1/2010 12:56:26 PMPCANC
Will be doing a confrence with Wendy L. at 12pm on the 2nd of Febuary. Later a site prep inspection will occur.
ESC10-00042 BMP Violation1/27/20102/1/20102/1/2010 10:54:38 AMAPART
Told RP tp clean up all sediment after each fill of the dump truck. Also do a cleaning at the end of the day.
ESC09-00791 BMP Violation1/26/20102/1/20102/1/2010 10:33:53 AMADONE
Vegitation will be used as a sediment barrier / firter to collect any run off into the storm catch basin.
ESC09-00808 Complaint Inspection2/1/20102/1/20102/1/2010 9:41:46 AMAFAIL
Correction Notice:
1. Clean up all sediment and debris off of all hard surfaces through out sub division.
2. Maintain and inspect storm drain inlet protecion through out the sub division.
3. Place all trash debris into the provided trash container through out the subdivision.
4. Remove or install all BMP's per industry standards.
Failure to comply will result in a stop work order. Will re-inspect on 2/2/10 PM.
ESC10-00018 BMP Violation1/26/20102/1/20102/1/2010 7:53:41 AMAPASS