Inspections for the day of: Tuesday, February 1, 2011.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00676 General Inspection2/1/20112/1/20112/1/2011 3:47:23 PM FAIL
COuld not reach the RP over phone number being not availible
ESC10-00546 General Inspection2/1/20112/1/20112/1/2011 2:45:16 PM PASS
ESC10-00362 Conference2/1/20112/1/20112/1/2011 2:39:10 PMPCANC
could not reach RP via phone and was noyt on site.
ESC09-00614 General Inspection2/1/20112/1/20112/1/2011 1:21:09 PM PASS
ESC10-00573 General Inspection2/1/20112/1/20112/1/2011 1:20:49 PM PASS
ESC10-00551 General Inspection2/1/20112/1/20112/1/2011 11:22:40 AM DONE
PErmit finalled.
ESC10-00551 DOC - Permit Finaled2/1/20112/1/20112/1/2011 11:22:24 AMPPASS
ESC10-00351 General Inspection2/1/20112/1/20112/1/2011 10:47:15 AM NR
Project has not begun. Will do a site prep on 2/8/2011 AM>
ESC10-00397 General Inspection2/1/20112/1/20112/1/2011 10:23:16 AM PASS
ESC04-01055 General Inspection2/1/20112/1/20112/1/2011 9:49:02 AM DONE
Permit finaled
ESC04-01055 DOC - Permit Finaled2/1/20112/1/20112/1/2011 9:48:46 AMPPASS
ESC07-00386 General Inspection2/1/20112/1/20112/1/2011 9:48:38 AM PASS
ESC11-00024 Site Preparation1/19/20112/1/20112/1/2011 9:08:44 AMAPART
BMP's inplace of the vault. Explained to RP to keep an eye on the clarity of the discharge while clearing out the tully's within the pond. the final discharge of the pond is an outfall off of Walnut street into the Boise River. All debris from the extraction will bee placed at the airport.
ESC11-00023 Site Preparation1/19/20112/1/20112/1/2011 9:05:46 AMAPART
Will be installing BMP's prior to the start of clearing within the pond tomorrow. Will re-inspect on 2/2/2011AM.