BLD04-02149
| BLD-Aging Inspection | 2/1/2012 | 2/1/2012 | 2/2/2012 11:38:18 AM | A | PASS |
|
|
life safety passed
|
FIR11-00642
| INSP-Conference | 2/1/2012 | 2/1/2012 | 2/1/2012 3:37:41 PM | P | DONE |
|
|
I went over duct smoke detector placement with Mountain Power Electric.
|
BLD11-02030
| FIRE-Final Inspection | 2/1/2012 | 2/1/2012 | 2/1/2012 2:39:56 PM | P | PASS |
|
|
life safety passed
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 1/30/2012 | 2/1/2012 | 2/1/2012 12:36:32 PM | A | CANC |
|
|
1st floor is not ready. To be rescheduled.
|
FIR12-00016
| INSP-Sprinkler Rough-in | 1/31/2012 | 2/1/2012 | 2/1/2012 11:52:03 AM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
BLD11-02949
| FIRE-Final Inspection | 1/31/2012 | 2/1/2012 | 2/1/2012 10:04:38 AM | A | FAIL |
|
|
The sprinkler pendants are located too close to one another. This work requires permits. Repair the exit signs/emergency lights out the rear exit corridor. provide exit discharge lights at the front and rear exit doors. provide the missing exit sign/emergency light in the entry to the back area as shown on plan sheet A7.01.
|
BLD12-00122
| FIRE-Final Inspection | 1/31/2012 | 2/1/2012 | 2/1/2012 8:01:43 AM | A | PASS |
|
|
life safety passed
|