ESC15-01435
| Conference | 1/29/2016 | 2/1/2016 | 2/2/2016 3:41:56 PM | A | PART |
|
|
Discussed project with RP. Wattles have been staked and repositioned on the slope on a vegetated area. It has not been trenched as specs require. Gave ok to leave untrenched as the plan is to leave the vegetaion undisturbed and hydroseeded the tracked disturbed slope above in the next several weeks. No current issues, will check next inspection.
Request to install sediment filter bag or mat on storm drain to left of driveway.
RP/GC agreed to corrections. Site currently is clean, permit posted, no trackout or discharges.
|
ESC15-00499
| Site Final | 2/1/2016 | 2/1/2016 | 2/2/2016 3:07:32 PM | P | PEND |
|
|
Construction complete. Wattles and stockpile remain on adjacent lot. Need to remove and clean area to pre-exisiting conditions.
BLD finaled with Del Taco open. No sediment leaving site, just need to clean materials. Bond issued for landscaping to be completed for zoning approval. Clean up by landscaper will be acceptable.
|
ESC14-01173
| General Inspection | 1/29/2016 | 2/1/2016 | 2/1/2016 4:17:13 PM | A | PART |
|
|
No single source of trackout, but Harrison and Dewey should be swept up and cleaned this week due to muddy feet and machinery.
Trent - ###-####
|
ESC13-00690
| Aging Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 3:50:04 PM | | PASS |
|
|
No activty..Hillside and drainage swale currently stabile.
|
ESC15-00659
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 3:28:16 PM | | PASS |
|
|
needs landscaping and temp BMP removal. No violations.
|
ESC15-00463
| Tracking Control | 2/1/2016 | 2/1/2016 | 2/1/2016 3:00:59 PM | P | PASS |
|
|
Report of trackout and damage done to lots on Alto Via.
Inspected this site, the only active site on Alto Via and there are no violations.BMPs installed .
Trackout is no longer significant on street, but some cookies and mud bogging was done on an open stretch and trash and litter at the end of the culdesac. Appears to be the work of joy-riders...
|
ESC13-00764
| Aging Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 2:28:34 PM | | CANC |
|
|
|
ESC14-00658
| Aging Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 2:28:19 PM | | PASS |
|
|
WIP on interior and grounds. No violations.
|
ESC15-01310
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 2:00:33 PM | P | PASS |
|
|
WIP on southgate Broadway Jackson's. No trackout to Broadway or muddy runoff. Parking and access is not occuring in the wet & muddy area. Construction entrance installed to Broadway for loading/unloading use.
No corrections at this time.
|
ESC15-00689
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 12:37:15 PM | | PASS |
|
|
WIP. No trackout. No spills or other prohibited discharges observed. Permit sings posted on job trailer.
|
ESC15-00688
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 12:36:57 PM | | PASS |
|
|
WIP. No trackout. No spills or other prohibited discharges observed. Permit sings posted on job trailer.
|
ESC15-01604
| Site Preparation | 1/29/2016 | 2/1/2016 | 2/1/2016 12:08:38 PM | A | PASS |
|
|
Onsite contact is Kyle Phone #: ###-#### Inspection requested via web by Kyle Buzzell
RP onsite to discuss on-going corrections at Park Place. Trash bins were emptied as requested, streets have been swept.
Corrections in progress today - DI bag maintenance, observed some draining very slowly. Concrete washout area to be cleaned up and moved.
Approved to start new excavation, will check back mid week
|
ESC15-01603
| Site Preparation | 1/29/2016 | 2/1/2016 | 2/1/2016 12:08:09 PM | A | PASS |
|
|
Onsite contact is Kyle Phone #: ###-#### Inspection requested via web by Kyle Buzzell
RP onsite to discuss on-going corrections at Park Place. Trash bins were emptied as requested, streets have been swept.
Corrections in progress today - DI bag maintenance, observed some draining very slowly. Concrete washout area to be cleaned up and moved.
Approved to start new excavation, will check back mid week
|
ESC15-01602
| Site Preparation | 1/29/2016 | 2/1/2016 | 2/1/2016 12:07:39 PM | A | PASS |
|
|
Onsite contact is Kyle Phone #: ###-#### Inspection requested via web by Kyle Buzzell
RP onsite to discuss on-going corrections at Park Place. Trash bins were emptied as requested, streets have been swept.
Corrections in progress today - DI bag maintenance, observed some draining very slowly. Concrete washout area to be cleaned up and moved.
Approved to start new excavation, will check back mid week
|
ESC15-01601
| Site Preparation | 1/29/2016 | 2/1/2016 | 2/1/2016 12:07:14 PM | A | PASS |
|
|
Onsite contact is Kyle Phone #: ###-#### Inspection requested via web by Kyle Buzzell
RP onsite to discuss on-going corrections at Park Place. Trash bins were emptied as requested, streets have been swept.
Corrections in progress today - DI bag maintenance, observed some draining very slowly. Concrete washout area to be cleaned up and moved.
Approved to start new excavation, will check back mid week
|
ESC15-00720
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 11:41:04 AM | P | PASS |
|
|
WIP. No trackout or discharges, trash and materials are contained. See also ESC15-01370 for monument sign. No corrections at this time.
|
ESC15-00955
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 11:27:42 AM | P | PASS |
|
|
Site currently inactive. Parking lot is complete, but still connected to roadway via rock entrance to prevent trackout. Any previous trackout that occured has been adequately cleaned. Site is now graded and will be ready for landscaping activities this Spring. No corrections. Yellow permit sign and SWPPP info posted.
|
ESC13-01159
| Random Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 10:58:36 AM | P | PASS |
|
|
WIP on SFHs by CBH. No active foundation work. Trackout and loose sediment observed in previous inspections have been swept up. No discharges, no spills observed.
Correction:
- Install new lined washout containment pit before any new homes can be started. - Clean up old washout.
|
ESC14-00432
| Random Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 10:26:54 AM | A | PART |
|
|
Storm drains w/in Aralar Park have DI bags that have remaining capacity. No trackout onto Lizaso, but Baserri needs thorough sweeping this week.
SWPPP sign posted with contact details. Vegetated buffer along both sides of creek are being maintained. SF on south bank was removed as requested.
Corrections:
Sweep streets weekly. Pick up wind-blown trash along streets banks of creek weekly.
|
ESC15-00627
| General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 9:10:36 AM | | PASS |
|
|
|