FIR16-00603
| INSP-Final Inspection | 2/1/2017 | 2/1/2017 | 2/1/2017 2:20:51 PM | P | PASS |
|
|
permit finaled
|
BLD16-02992
| FIRE-Final Inspection | 1/31/2017 | 2/1/2017 | 2/1/2017 1:52:23 PM | A | FAIL |
|
|
Not ready for a final until the project related fire alarm and fire sprinkler permits have been addressed. Myself and the contractor did perform a conference and discussed the location of fire extinguishers.
|
FIR16-00557
| INSP-Sprinkler Rough-in | 2/1/2017 | 2/1/2017 | 2/1/2017 1:51:18 PM | P | PASS |
|
|
The piping above the second floor restroom and Janitors closet is ok to cover.
|
FIR17-00021
| INSP-Final Inspection | 2/1/2017 | 2/1/2017 | 2/1/2017 12:53:59 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00005
| INSP-Final Inspection | 1/31/2017 | 2/1/2017 | 2/1/2017 12:04:12 PM | A | PASS |
|
|
Permit finaled. No drawings on site so Sam emailed me copies.
|
BLD17-00167
| FIRE-Final Inspection | 1/31/2017 | 2/1/2017 | 2/1/2017 10:10:48 AM | A | FAIL |
|
|
Repair or remove the non-required exit signs, provide a mounted and tagged fire extinguisher as discussed.
|