ELE19-00403
| Final | 1/31/2019 | 2/1/2019 | 2/1/2019 2:00:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Bowen...ok to final
|
ELE18-02434
| Conference | 2/1/2019 | 2/1/2019 | 2/1/2019 1:55:25 PM | P | PASS |
|
|
Request to extend permit. Please call Matt if you have questions ###-#### ...ok to final
|
ELE18-01684
| Final | 2/1/2019 | 2/1/2019 | 2/1/2019 1:31:08 PM | P | PASS |
|
|
call for acess- Danielle Phone #: ###-####.. ok to final
|
ELE19-00394
| Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 1:04:04 PM | P | FAIL |
|
|
Should all be open Phone #: ###-#### Inspection requested via web by Brad Baker... 1..NM cable ran parallel to framing members shall keep 1 1/4" distance from nearest edge of framing member 300.4(D) 2..where NM cable enters a junction box or device box a minimum of a 1/4 " of sheathing shall be in box- MULTIPLE LOCATIONS..314.17(C) 3..NM cable shall be secured/supported every 4 1/2 ft and within 12" of every cable entry into enclosure-334.30, within 8" of plastic boxes 314.17(C) 4..home runs need stapled within 12" of panel
|
ELE18-01099
| Conference | 2/1/2019 | 2/1/2019 | 2/1/2019 11:41:45 AM | P | PASS |
|
|
Customer request to extend permit. Call Luke ###-####-6499...spoke with permit holder...hasnt had time to start project...ok to extend permit
|
ELE18-02665
| Permanent Service | 1/31/2019 | 2/1/2019 | 2/1/2019 11:00:55 AM | A | NR |
|
|
PLEASE CONTACT RICH BAIL ON SITE ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden... available fault current label required independent verification of 3 phase 1600V service needs done all before perm service can be given
|
ELE18-03531
| Final | 1/31/2019 | 2/1/2019 | 2/1/2019 10:38:47 AM | A | FAIL |
|
|
Duane-please call GC 1 hr prior to meet for access Phone #: ###-####... exhaust fan/light in shower shall have GFCI protection and be rated to be installed in damp location.
|
ELE19-00308
| Final | 1/31/2019 | 2/1/2019 | 2/1/2019 9:46:10 AM | A | PASS |
|
|
service change Phone #: ###-#### Inspection requested via web by Calvin Bohrer... ok to final
|
ELE19-00297
| Final | 2/1/2019 | 2/1/2019 | 2/1/2019 9:11:32 AM | A | PASS |
|
|
attn Tom Saunders Phone #: ###-#### Inspection requested via web by Caleb Gaylord.. ok to final
|
ELE19-00407
| Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 8:53:13 AM | A | PASS |
|
|
Inspection requested via web by Same Electric... rough in kitchen ok to cover
|