BLD17-03011
| BLD-Conference | 1/27/2019 | 1/28/2019 | | A | |
|
|
see PW notes dated 10/27/17. if questions call dianne ###-#### ex. 2
|
BLD18-01896
| BLD-Aging Inspection | 2/1/2019 | 2/1/2019 | 2/8/2019 3:34:02 PM | | PEND |
|
|
|
BLD15-04379
| BLD-Aging Inspection | 2/1/2019 | 2/1/2019 | 2/8/2019 3:33:38 PM | | PEND |
|
|
|
MIS19-00024
| BLD-Conference | 1/29/2019 | 2/1/2019 | 2/8/2019 3:30:36 PM | P | PEND |
|
|
remodel without permit Phone #: ###-####// status review
|
BLD19-00296
| BLD-Foundation | 1/31/2019 | 2/1/2019 | 2/2/2019 2:43:47 PM | P | PASS |
|
|
Jack Phone #: ###-####
|
BLD18-00670
| BLD-Framing/Rough-in | 2/1/2019 | 2/1/2019 | 2/1/2019 3:16:18 PM | P | NR |
|
|
Caulk and seal and partial framing for cover. Need to finish two walls of shear on the inside and then framing inspection should be set. Please call before hand as approved plans are locked in trailer. Thank you, Clayton Conner Phone #: ###-#### Inspection requested via web by Clayton Conner,, walk through part only
|
BLD18-03756
| BLD-Energy code compliance | 1/31/2019 | 2/1/2019 | 2/1/2019 3:12:13 PM | P | PART |
|
|
Brett Phone #: ###-####,, ok to cover after fireblocking ceiling lines
|
BLD18-04496
| BLD-Energy code compliance | 2/1/2019 | 2/1/2019 | 2/1/2019 3:01:38 PM | P | PART |
|
|
Robert Phone #: ###-####,, work in progress
|
BLD18-03274
| BLD-Final | 1/31/2019 | 2/1/2019 | 2/1/2019 2:25:22 PM | A | NR |
|
|
Dustin Phone #: ###-####
|
BLD19-00018
| BLD-Energy code compliance | 1/31/2019 | 2/1/2019 | 2/1/2019 1:13:52 PM | A | PASS |
|
|
Brian Phone #: ###-####
|
BLD18-03797
| BLD-Wall Bracing | 2/1/2019 | 2/1/2019 | 2/1/2019 12:31:40 PM | A | PASS |
|
|
Shear wall inspection. Please call before as approved set is in trailer. Thank you, Clayton Conner Phone #: ###-#### Inspection requested via web by Clayton Conner,, exterior ok after minor fixes
|
BLD18-00670
| BLD-Energy code compliance | 2/1/2019 | 2/1/2019 | 2/1/2019 12:30:53 PM | A | PART |
|
|
Caulk and seal and partial framing for cover. Need to finish two walls of shear on the inside and then framing inspection should be set. Please call before hand as approved plans are locked in trailer. Thank you, Clayton Conner Phone #: ###-#### Inspection requested via web by Clayton Conner,, foam seal ok after minor fixes,, frame not ready,, partial walk through only
|
BLD18-02064
| BLD-Foundation | 1/31/2019 | 2/1/2019 | 2/1/2019 11:06:10 AM | A | PART |
|
|
Mike-this insp has nothing to do woithg the plan mod on permit Phone #: ###-####,, 1st 4' 8" of masonary wall,, 2 bond beams included
|
BLD18-04407
| BLD-Footing | 1/31/2019 | 2/1/2019 | 2/1/2019 10:44:34 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Beau Brazier// north west corner area
|
BLD18-04371
| BLD-Wall Bracing | 1/31/2019 | 2/1/2019 | 2/1/2019 10:20:14 AM | A | PASS |
|
|
George- Phone #: ###-####-can you please 30 minutes prior? George wants to meet you there
|
BLD18-03980
| BLD-Energy code compliance | 1/31/2019 | 2/1/2019 | 2/1/2019 9:53:19 AM | A | PASS |
|
|
Jeremy Phone #: ###-####
|
BLD18-01115
| BLD-Final | 1/31/2019 | 2/1/2019 | 2/1/2019 12:00:00 AM | P | CANC |
|
|
Jake Phone #: ###-#### // cancelled by phone GF
|
BLD19-00043
| BLD-Framing/Rough-in | 1/30/2019 | 2/1/2019 | 1/31/2019 12:00:00 AM | P | CANC |
|
|
Roof framing // Micah Phone #: ###-#### // Homeowner called to cancel inspection GF
|