BLD96-01709
| INSP - Framing/Rough-in | 2/9/1998 | 2/10/1998 | 2/10/1998 12:00:00 AM | A | PART |
|
|
dominic ###-#### fire wall reinspect...dom not onsite, w.i.p.
|
BLD96-02800
| INSP - Framing/Rough-in | 2/11/1998 | 2/10/1998 | 2/10/1998 12:00:00 AM | P | PART |
|
|
not frame, conf w/ arch scott & russ
|
BLD97-02259
| INSP - Framing/Rough-in | 2/10/1998 | 2/10/1998 | 2/10/1998 12:00:00 AM | P | NR |
|
|
joel ###-#### framing, NR, NEED COMPLETE DETAILING FOR 1HR CONST...FIRESTOPS, GYP ETC... NEED TO CHK W/ RON HILL IF SPRINKLER SUBSTITUTION USED,NOT INDICATED ON PLAN.
|
BLD97-03384
| INSP - Framing/Rough-in | 2/10/1998 | 2/10/1998 | 2/10/1998 12:00:00 AM | P | PART |
|
|
JACK ###-####...OK TO COVER, C/N OK; NEED CHK GYP ATTACHMENT AT 1HR WALLS.
|
BLD97-03450
| INSP - Final | 2/10/1998 | 2/10/1998 | 2/10/1998 12:00:00 AM | P | PASS |
|
|
key over front door john ###-#### final; LC ISSUED, C/N OK
|
BLD98-00006
| INSP - Framing/Rough-in | 2/9/1998 | 2/10/1998 | 2/10/1998 12:00:00 AM | P | PART |
|
|
john ###-#### engineering on framing....NOT FULL FRAME INSP, CHK'D SHEAR PANELS & HD'S AT HOUSE WLL, STRAP AT ROOF OK, NEED FURTHER INSP WHEN COMPLETED.
|