BLD99-02254
| BLD-Final | 2/8/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 14:01:56. Contact: ###-####. l/c issued 2/10/00 1:47:43 PM
|
BLD99-03691
| BLD-Framing/Rough-in | 2/9/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | A | PASS |
|
|
###-#### Larry
|
BLD99-03691
| BLD-Energy code compliance | 2/9/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | A | PASS |
|
|
|
BLD99-02806
| BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | A | CANC |
|
|
Impact Radio Station at the Boise Spectrum
|
BLD99-03622
| BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 16:27:56. Contact: ###-####. Card to contractor
|
BLD99-01882
| BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | P | FAIL |
|
|
###-#### need eng'r ok and all other insp's
|
BLD99-03096
| BLD-Framing/Rough-in | 2/10/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | P | PART |
|
|
###-#### ok to cover walls add gyp @ int of shafts ok to continue.
|
MEC00-00005
| Final | 2/10/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | P | FAIL |
|
|
GEORGE ###-#### FN
|
BLD00-00093
| BLD-Conference | 2/10/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | P | PASS |
|
|
w/ owner
|
BLD99-03741
| BLD-Conference | 2/10/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | P | PASS |
|
|
w/ framer
|
BLD99-03701
| BLD-Conference | 2/10/2000 | 2/10/2000 | 2/10/2000 12:00:00 AM | P | PASS |
|
|
placed swo per 325; ok to lift as check ok. wip
|