PLM02-03432
| PLM-Aging Inspection | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | | FAIL |
|
|
not tested yet 2/10/2003 10:06:38 AM
|
PLM02-03550
| Plumbing Rough-in | 2/7/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | A | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung called and said he'd be ready tomarrow pm 2/10/2003 9:04:05 AM
|
PLM03-00313
| Sprinkler (Final) | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | P | PASS |
|
|
###-#### chris sp final ok 2/10/2003 2:43:50 PM
|
PLM02-03427
| Final | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/10/2003 at 8:42:53 AM. Contact: ###-####. final ok with dw hose secured 2/10/2003 3:36:14 PM
|
PLM03-00315
| Water and/or Sewer | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | P | PASS |
|
|
###-#### left sewer back about 20 ' for new stub, need room to excavate. final ok 2/10/2003 2:42:57 PM
|
PLM02-03550
| Plumbing Rough-in | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | P | PART |
|
|
ok to cover walls,needs to tie everything together in the crawlspace 2/10/2003 3:21:03 PM
|
PLM02-01860
| Other | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | P | PART |
|
|
PER BILL owner will refit waste and vent and call for another conference. 2/10/2003 2:43:37 PM
|
PLM03-00317
| Plumbing Rough-in | 2/10/2003 | 2/10/2003 | 2/10/2003 12:00:00 AM | P | FAIL |
|
|
CRAIG ###-#### water system test failed 2/10/2003 4:05:51 PM
|