Inspections for the day of: Monday, February 10, 2003.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-04093 PLM-Aging Inspection2/10/20032/10/20032/10/2003 12:00:00 AM PASS
finaled by inspector 309 on 2/5/ 2001 2/10/2003 8:03:07 AM
PLM02-00922 PLM-Aging Inspection2/10/20032/10/20032/10/2003 12:00:00 AM PASS
Lane from inselman plumbing told me roof drain and over flow was inspected and some how inspection was not entered in system by inspector at that time 2/11/2003 3:35:27 PM
PLM02-02701 PLM-Aging Inspection2/10/20032/10/20032/10/2003 12:00:00 AM PASS
talked to plumbing contractor and was told project was on hold until b.f.i. has acquired all approved permit,s . told contractor permit was going to expire soon and they need to call for extension if project is not done soon 2/10/2003 1:34:14 PM
PLM03-00301 Water and/or Sewer2/10/20032/10/20032/10/2003 12:00:00 AMAPASS
PLM02-03503 Final2/10/20032/10/20032/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/10/2003 at 6:43:20 AM.
PLM03-00314 Plumbing Rough-in2/10/20032/10/20032/10/2003 12:00:00 AMPPASS
###-####
PLM01-02891 Final2/10/20032/10/20032/10/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/10/2003 at 8:13:39 AM. Contact: ###-####.