FIR03-00575
| FIR-Aging Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | | PASS |
|
|
this project is still under construction 2/10/2004 12:47:59 PM
|
FIR03-00732
| INSP-Final Inspection | 2/9/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
8:30 strobe not installed per plans and the 75 cd strobe doesn't reach the south wall 2/10/2004 9:42:57 AM
|
FIR03-00601
| INSP-Sprinkler Rough-in/Hydro | 2/9/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | PART |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore okay to cover; need data on trapeeze's; need resubmittals for changes (upright heads used above grid throughout and minor changes to head layout in open multi - purpose room); still need hydro and alarm tests; vestibule not completed so branch line isn't installed yet 2/10/2004 4:03:43 PM
|
FIR04-00082
| INSP-Sprinkler Rough-in/Hydro | 2/9/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/9/2004 at 5:09:14 PM. Contact: ###-####. UG okay to cover; sleeve needed for ductile; tamper conduit not installed yet; 2/10/2004 11:09:11 AM
|
FIR04-00017
| INSP-Final Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | PASS |
|
|
|
BLD03-01977
| FIRE-Conference | 2/10/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | PART |
|
|
sprinklers heads not installed in all rooms in basement; heads obstructed in basement; need cages on all heads; curtain installed at main exit obstructing it and plastic lobby installed at main exit; repair exit sign; called GC ###-#### about these problems 2/10/2004 9:45:16 AM
|
BLD03-02937
| FIRE-Final Inspection | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | PASS |
|
|
###-#### craig
|
FIR03-00115
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
Scott Carter. 1 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:55:09 PM 2/10/2004 3:56:31 PM
|
FIR03-00135
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
Scott Carter 2 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:55:22 PM 2/10/2004 3:56:14 PM
|
FIR03-00136
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
Scott Carter 3 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:55:55 PM
|
FIR03-00137
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
Scott Carter 4 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:57:11 PM
|
FIR03-00138
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
Scott Carter 5 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:57:27 PM
|
FIR03-00139
| INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | A | FAIL |
|
|
Scott Carter 6 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:54:55 PM 2/10/2004 3:56:53 PM
|
FIR03-00642
| INSP-Final Inspection | 2/9/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/9/2004 at 9:06:53 AM. Contact: ###-####.
|
BLD03-01636
| FIRE-Final Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 12:00:00 AM | P | PASS |
|
|
fire/life safety final okay 2/10/2004 4:00:01 PM
|