PLM05-03314
| Plumbing Rough-in | 2/10/2006 | 2/10/2006 | 2/10/2006 4:12:36 PM | P | PART |
|
|
###-#### - DONNY nOTE: PLEASE INSPEC BEFORE 3:00 IS POSSIBLE still need to finish some area,s on DWV and water for rough-in
|
PLM05-04137
| Plumbing Rough-in | 2/10/2006 | 2/10/2006 | 2/10/2006 4:09:22 PM | P | PART |
|
|
###-#### - DONNY need to repipe lab area sink
|
PLM06-00364
| Plumbing Rough-in | 2/10/2006 | 2/10/2006 | 2/10/2006 2:42:39 PM | P | PART |
|
|
Roy -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong need to move water lines out from outside wall at washer box and have tub and shower stall and valve installed for rough-in contractor to call when ready
|
PLM05-03090
| Plumbing Rough-in | 2/10/2006 | 2/10/2006 | 2/10/2006 2:00:12 PM | P | PART |
|
|
ROBERT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles water test ok need to test over head DWV home owner to recall when ready
|
PLM06-00387
| Plumbing Rough-in | 2/10/2006 | 2/10/2006 | 2/10/2006 1:58:57 PM | P | PASS |
|
|
Craig -- for groundwork; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|