Inspections for the day of: Tuesday, February 10, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00736 INSP-Conference2/5/20092/10/20092/18/2009 7:22:37 AMPDONE
Per Ray the city approved plans have been found. Inspection to be called back in.
FIR08-00521 INSP-Final Inspection2/9/20092/10/20092/10/2009 3:24:43 PMPPASS
Permit finaled
FIR08-00514 INSP-Final Inspection2/9/20092/10/20092/10/2009 3:24:13 PMPPASS
Permit finaled
BLD09-00090 FIRE-Final Inspection2/10/20092/10/20092/10/2009 12:13:16 PMAPASS
Life safety passed
FIR07-01031 INSP-Sprinkler Rough-in2/9/20092/10/20092/10/2009 11:22:38 AMAPASS
See the approved plans for corridor piping that can be covered.
BLD08-02357 FIRE-Final Inspection2/9/20092/10/20092/10/2009 11:21:00 AMAPASS
Life safety passed
BLD08-02357 FIRE-Final Inspection2/10/20092/10/20092/10/2009 7:36:28 AMAFAIL
The exit sign/emergency light at the main exit did not operate with the test switch and appears to need to be repaired. All other items were ok.